COUNTY: LUBBOCK HIGHWAY: US 84, ETCLENGTH: 14.5800MI CONTROL NUMBER: 0052-07-071, ETCDBE GOAL: 3.5 % PROJECT NUMBER: NH 2020(749) TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 234 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM APRIL 09, 2020 EST.COST: 7,138,870.25 BIDS WILL BE OPENED: 1:00 PM APRIL 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMICHAEL WITTIE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 135 SLATON ROAD 200 E RIVERSIDELUBBOCK, TX 79404 AUSTIN TX 78704-1204806/748-4466 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ LUBBOCK0052-07-071HOCKLEY COUNTY LINE US 84NH 2020(749)END DIVIDED HWY NW OF SL 289 LENGTH: 14.5790 MILES LUBBOCK0053-01-127BU 84 INTERCHANGE, S AND SE US 84NH 2020(749)GARZA COUNTY LINE LENGTH: 0.0010 MILES LUBBOCK0131-01-060SL 289, NE US 62NH 2020(749)200' WEST N MAIN ST. IN IDALOU LENGTH: MILES LUBBOCK0131-02-041200' WEST OF N MAIN ST. IN IDALOU US 62NH 2020(749)CROSBY COUNTY LINE LENGTH: MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 106 6001OBLITERATING ABANDONED ROADSTA 72.7201 134 6001BACKFILL (TY A)STA 72.7202 150 6001BLADINGSTA 1,468.7203 314 6013EMULS ASPH (EROSN CONT)(CSS-1H)GAL 32,267.0004 315 6004FOG SEAL (CSS-1H)GAL 452.0005 432 6046RIPRAP (MOW STRIP)(5 IN)CY 6,465.0006 496 6004REMOV STR (SET)EA 4.0007 496 6007REMOV STR (PIPE)LF 120.0008 500 6001MOBILIZATIONLS 1.0009 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00010 506 6035SANDBAGS FOR EROSION CONTROLEA 306.00011 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 1,590.00012 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,590.00013 533 6003RUMBLE STRIPS (SHOULDER) ASPHALTLF 7,525.00014 543 6002CABLE BARRIER SYSTEM (TL-4)LF 139,618.00015 543 6020CABLE BARRIER TERMINAL SECTION (TL-4)EA 110.00016 666 6224PAVEMENT SEALER 4"LF 7,525.00017 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 7,525.00018 677 6003ELIM EXT PAV MRK & MRKS (8")LF 3,130.00019 678 6001PAV SURF PREP FOR MRK (4")LF 7,525.00020 730 6107FULL - WIDTH MOWINGCYC 4.00021 734 6002LITTER REMOVALCYC 4.00022 61856002TMA (STATIONARY)DAY 468.00023 61856005TMA (MOBILE OPERATION)DAY 24.00024