COUNTY: ROBERTSON HIGHWAY: FM 46 LENGTH: 32.6480MI CONTROL NUMBER: 0049-14-012, ETCDBE GOAL: 6.0 % PROJECT NUMBER: STP 2019(497), ETC TYPE: GRDG,WDN,STRCS,BASE,SURF,SGNS,MRKGS TIME FOR COMPLETION: 93 WORKING DAYSGUARANTY: 41,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 05, 2019 EST.COST: 2,054,388.50 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHAD BOHNE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2102 TABOR ROAD 200 E RIVERSIDEBRYAN, TX 77803 AUSTIN TX 78704-1204979/778-6233 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ ROBERTSON0049-14-012THE FALLS COUNTY LINE FM 46STP 2019(497)SH 14 LENGTH: 1.37 MILES ROBERTSON0049-14-011FALLS CO LINE FM 46STP 1702(019)HESGSH 14 LENGTH: 1.37 MILES ROBERTSON0540-01-047SH 14 FM 46STP 1702(063)HESGUS 79 LENGTH: 16.8880 MILES ROBERTSON0540-02-026US 79 FM 46STP 1702(064)HESGOSR LENGTH: 13.02 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 83.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 205.0002 104 6021REMOVING CONC (CURB)LF 22.0003 110 6001EXCAVATION (ROADWAY)CY 103.0004 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 509.0005 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 14,499.0006 164 6001BROADCAST SEED (PERM) (RURAL) (SANDY)SY 14,499.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 7,251.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 7,251.0009 168 6001VEGETATIVE WATERINGMG 145.00010 169 6006SOIL RETENTION BLANKETS (CL 2) (TY F)SY 157.00011 247 6312FL BS (CMP IN PLC)(TY D GR1-2)(8")SY 31,273.00012 251 6114REWORK BS MATL (TY B)(10")(OC)SY 22,400.00013 275 6001CEMENTTON 476.00014 275 6011CEMENT TREAT(EXIST MATL)(8")SY 31,273.00015 316 6029ASPH (RC-250)GAL 6,945.00016 316 6277ASPH (SPG 73-19)GAL 21,112.00017 316 6403AGGR (TY-B GR-5 OR TY-L GR-5)CY 206.00018 316 6404AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)CY 446.00019 354 6209PLANE ASPH CONC PAV (5"-7")SY 21,750.00020 400 6005CEM STABIL BKFLCY 246.00021 400 6006CUT & RESTORING PAVSY 125.00022 402 6001TRENCH EXCAVATION PROTECTIONLF 85.00023 403 6001TEMPORARY SPL SHORINGSF 1,424.00024 432 6001RIPRAP (CONC)(4 IN)CY 15.00025 432 6045RIPRAP (MOW STRIP)(4 IN)CY 35.00026 462 6067CONC BOX CULV (8 FT X 8 FT)(EXTEND)LF 4.00027 464 6003RC PIPE (CL III)(18 IN)LF 712.00028 464 6005RC PIPE (CL III)(24 IN)LF 256.00029 464 6010RC PIPE (CL III)(48 IN)LF 96.00030 466 6103HEADWALL (CH - PW - 0) (DIA= 48 IN)EA 2.00031 467 6288SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)EA 4.00032 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 42.00033 467 6388SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 8.00034 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 4.00035 480 6001CLEAN EXIST CULVERTSEA 1.00036 496 6004REMOV STR (SET)EA 4.00037 496 6005REMOV STR (WINGWALL)EA 2.00038 496 6006REMOV STR (HEADWALL)EA 2.00039 496 6008REMOV STR (BOX CULVERT)LF 5.00040 496 6016REMOV STR (PIPE)EA 27.00041 500 6001MOBILIZATIONLS 1.00042 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00043 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 720.00044 506 6011ROCK FILTER DAMS (REMOVE)LF 720.00045 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 4,092.00046 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 4,092.00047 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 15.00048 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 15.00049 530 6004DRIVEWAYS (CONC)SY 160.00050 530 6005DRIVEWAYS (ACP)SY 976.00051 530 6006DRIVEWAYS (SURF TREAT)SY 557.00052 530 6008TURNOUTS (ACP)SY 122.00053 540 6001MTL W-BEAM GD FEN (TIM POST)LF 275.00054 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00055 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 6.00056 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 2.00057 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 32.00058 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 7.00059 644 6007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA 1.00060 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 1.00061 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 2.00062 644 6034IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)EA 4.00063 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 2.00064 644 6076REMOVE SM RD SN SUP&AMEA 47.00065 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 7.00066 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 14.00067 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 10.00068 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 174.00069 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 2,682.00070 666 6036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF 163.00071 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 44.00072 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 110.00073 666 6282REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)LF 159,857.00074 666 6287REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)LF 196,016.00075 666 6291REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)LF 22,109.00076 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 3,394.00077 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 342.00078 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 2,253.00079 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 9,753.00080 666 6344REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)LF 1,178.00081 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 7,376.00082 668 6077PREFAB PAV MRK TY C (W) (ARROW)EA 1.00083 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 3.00084 672 6007REFL PAV MRKR TY I-CEA 9.00085 672 6009REFL PAV MRKR TY II-A-AEA 5,551.00086 685 6002RELOCATE RDSD FLASH BEACON ASSEMBLYEA 2.00087 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.00088 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 15,577.00089 61856001TMA (STATIONARY)EA 2.00090 61856005TMA (MOBILE OPERATION)DAY 22.00091