COUNTY: GRAYSON HIGHWAY: SH 5 LENGTH: 0.4270MI CONTROL NUMBER: 0047-03-096 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2021(597)TAPS TYPE: BICYCLE INFRASTRUCTURE IMPROVEMENTS TIME FOR COMPLETION: 93 WORKING DAYSGUARANTY: 18,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 01, 2021*EST.COST: 890,488.00 BIDS WILL BE OPENED: 1:00 PM DECEMBER 01, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONAARON BLOOM ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3904 US 75 SOUTH 200 E RIVERSIDESHERMAN, TX 75090 AUSTIN TX 78704-1204903/892-6529 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: NEWPORT DR AT PARTIN ELEMENTARY SCHOOL LIMITS TO: 0.645 MI S OF FM 3133 AT MOORE PARK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6003PREPARING ROW(TREE)(5" TO 12" DIA)EA 20.0001 100 6004PREPARING ROW(TREE)(12" TO 24" DIA)EA 6.0002 100 6007PREP ROW (TREE)(GREATER THAN 24" DIA)EA 1.0003 100 6015PREPARING ROW (HAND CLEARING)AC 1.0004 104 6001REMOVING CONC (PAV)SY 104.0005 104 6021REMOVING CONC (CURB)LF 58.0006 104 6031REMOVING CONC (HEADWALL)CY 1.0007 110 6003EXCAVATION (SPECIAL)CY 437.0008 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 700.0009 162 6002BLOCK SODDINGSY 2,845.00010 168 6001VEGETATIVE WATERINGMG 50.00011 403 6001TEMPORARY SPL SHORINGSF 280.00012 432 6045RIPRAP (MOW STRIP)(4 IN)CY 20.00013 450 6051RAIL (HANDRAIL)(TY E)LF 112.00014 460 6001CMP (GAL STL 12 IN)LF 88.00015 460 6004CMP (GAL STL 30 IN)LF 11.00016 462 6046CONC BOX CULV (3 FT X 3 FT)(EXTEND)LF 11.00017 467 6121SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C)EA 1.00018 467 6319SET (TY II) (12 IN) (CMP) (6: 1) (P)EA 2.00019 467 6410SET (TY II) (30 IN) (CMP) (6: 1) (P)EA 1.00020 496 6004REMOV STR (SET)EA 1.00021 500 6001MOBILIZATIONLS 1.00022 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 6.00023 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 234.00024 506 6024CONSTRUCTION EXITS (REMOVE)SY 234.00025 506 6034CONSTRUCTION PERIMETER FENCELF 108.00026 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,164.00027 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,164.00028 529 6008CONC CURB & GUTTER (TY II)LF 29.00029 530 6004DRIVEWAYS (CONC)SY 77.00030 531 6003CONC SIDEWALKS (6")SY 2,678.00031 531 6024CURB RAMPS (TY 7)SY 5.00032 540 6022MTL THRIE-BEAM GD FEN (STEEL POST)EA 400.00033 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00034 644 6070RELOCATE SM RD SN SUP&AM TY S80EA 14.00035 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 2.00036 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 6.00037 772 6001POST AND CABLE FENCE (REMOVAL)LF 18.00038 772 6005POST AND CABLE FENCE(REMV / REPL POSTS)EA 14.00039 772 6006POST AND CABLE FENCE(RMV/REPL CNC ANCH)EA 14.00040 772 6007POST AND CABLE FENCE (REMV/ REPL CABLE)LF 108.00041 50336002REMOVABLE BOLLARDEA 10.00042 61856002TMA (STATIONARY)DAY 90.00043 61856003TMA (MOBILE OPERATION)HR 20.00044 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $28,680.00