COUNTY: LAMAR HIGHWAY: US 82 LENGTH: 0.41MI CONTROL NUMBER: 0045-11-044 DBE GOAL: 3.5 % PROJECT NUMBER: STP 2023(236)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 79 WORKING DAYSGUARANTY: 45,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 02, 2022*EST.COST: 2,228,124.60 BIDS WILL BE OPENED: 1:00 PM DECEMBER 02, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDANIEL TAYLOR ATTN: CONSTRUCTION DIVISION - M1C3.02 3600 SW LOOP 286 6230 E. STASSNEY LANEPARIS, TX 75460 AUSTIN TX 78744-3147903/784-1357 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT 1502 LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 22.0001 105 6015REMOVING STAB BASE & ASPH PAV (8"-10")SY 4,818.0002 110 6001EXCAVATION (ROADWAY)CY 2,500.0003 112 6001SUBGRADE WIDENING (ORD COMP)STA 22.0004 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 2,500.0005 134 6002BACKFILL (TY B)STA 22.0006 152 6001ROAD GRADER WORK (ORD COMP)STA 22.0007 162 6002BLOCK SODDINGSY 14,454.0008 164 6009BROADCAST SEED (TEMP) (WARM)SY 7,227.0009 164 6011BROADCAST SEED (TEMP) (COOL)SY 7,227.00010 168 6001VEGETATIVE WATERINGMG 87.00011 216 6001PROOF ROLLINGHR 4.00012 275 6001CEMENTTON 211.00013 275 6080CEMENT TREAT (SUBGRADE)(12")SY 10,599.00014 354 6031PLANE ASPH CONC PAV(0" TO 12")SY 89.00015 354 6051PLANE ASPH CONC PAV (0" TO 1 1/2")SY 482.00016 400 6008CUT & RESTORE ASPH PAVINGSY 39.00017 400 6012CUT AND RESTORE PAV (FLEX BASE)SY 240.00018 462 6056CONC BOX CULV (6 FT X 5 FT)(EXTEND)LF 17.00019 464 6003RC PIPE (CL III)(18 IN)LF 456.00020 466 6195WINGWALL (PW - 2) (HW=6 FT)EA 2.00021 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 28.00022 496 6006REMOV STR (HEADWALL)EA 2.00023 496 6016REMOV STR (PIPE)EA 14.00024 500 6001MOBILIZATIONLS 1.00025 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00026 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 60.00027 506 6011ROCK FILTER DAMS (REMOVE)LF 60.00028 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 20.00029 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 120.00030 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 120.00031 530 6008TURNOUTS (ACP)SY 62.00032 533 6001RUMBLE STRIPS (SHOULDER)LF 4,336.00033 533 6002RUMBLE STRIPS (CENTERLINE)LF 1,829.00034 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 10.00035 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 10.00036 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 5.00037 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 2.00038 644 6076REMOVE SM RD SN SUP&AMEA 16.00039 658 6047INSTL OM ASSM (OM-2Y)(WC)GNDEA 2.00040 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 16,128.00041 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 16,128.00042 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,613.00043 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 3,500.00044 666 6047REFL PAV MRK TY I (W)24"(SLD)(090MIL)LF 10.00045 666 6053REFL PAV MRK TY I (W)(ARROW)(090MIL)EA 4.00046 666 6077REFL PAV MRK TY I (W)(WORD)(090MIL)EA 4.00047 666 6098REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)EA 5.00048 666 6140REFL PAV MRK TY I (Y)12"(SLD)(090MIL)LF 14,094.00049 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 10,752.00050 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 10,752.00051 672 6009REFL PAV MRKR TY II-A-AEA 109.00052 677 6001ELIM EXT PAV MRK & MRKS (4")LF 16,128.00053 30196001TRACKLESS TACK COATGAL 482.00054 30576001REINFORMT GRID FOR ASPHALT PVMT OVERLAYSY 2,409.00055 30766001D-GR HMA TY-B PG64-22TON 5,722.00056 30766067D-GR HMA TY-C SAC-A PG64-22(EXEMPT)TON 1,735.00057 30766068D-GR HMA TY-D SAC-A PG64-22(EXEMPT)TON 121.00058 30846001BONDING COURSEGAL 771.00059 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00060 61856002TMA (STATIONARY)DAY 79.00061 61856003TMA (MOBILE OPERATION)HR 40.00062 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $60,593.27