COUNTY: HARRIS HIGHWAY: BU 90-U LENGTH: 10.7910MI CONTROL NUMBER: 0028-01-098 DBE GOAL: 5.0 % PROJECT NUMBER: NH 2019(762) TYPE: CULVERT & STORM DRAINAGE WORK TIME FOR COMPLETION: 293 WORKING DAYSGUARANTY: 44,000.00 BIDS RECEIVED UNTIL: 0 JUNE 04, 2019*EST.COST: 2,200,397.52 BIDS WILL BE OPENED: 1:00 PM JUNE 04, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOHN ELAM ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 16803 EASTEX FRWY 200 E RIVERSIDEHUMBLE, TX 77347 AUSTIN TX 78704-1204281/319-6400 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EAST OF MESA DRIVE LIMITS TO: SAN JACINTO RIVER BRIDGE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 162 6002BLOCK SODDINGSY 1,929.0001 166 6001FERTILIZERAC 0.7502 168 6001VEGETATIVE WATERINGMG 44.9603 400 6005CEM STABIL BKFLCY 4,057.0004 400 6007CUT & RESTORE CONC PAVINGSY 25.0005 400 6008CUT & RESTORE ASPH PAVINGSY 1,613.0006 400 6009CEMENT STAB BACKFILL (INLET OR MH)CY 130.0007 400 6012CUT AND RESTORE PAV (FLEX BASE)SY 1,049.0008 464 6003RC PIPE (CL III)(18 IN)LF 726.0009 464 6005RC PIPE (CL III)(24 IN)LF 1,428.00010 464 6007RC PIPE (CL III)(30 IN)LF 762.00011 464 6008RC PIPE (CL III)(36 IN)LF 960.00012 464 6017RC PIPE (CL IV)(18 IN)LF 402.00013 464 6018RC PIPE (CL IV)(24 IN)LF 2,268.00014 464 6019RC PIPE (CL IV)(30 IN)LF 930.00015 464 6020RC PIPE (CL IV)(36 IN)LF 252.00016 464 6021RC PIPE (CL IV)(42 IN)LF 252.00017 465 6006JCTBOX(COMPL)(PJB)(4FTX4FT)EA 2.00018 465 6168INLET (COMPL)(TY A)EA 9.00019 465 6170INLET (COMPL)(TY AZ)EA 11.00020 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 12.00021 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 72.00022 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 30.00023 467 6444SET (TY II) (36 IN) (CMP) (6: 1) (P)EA 12.00024 467 6460SET (TY II) (42 IN) (CMP) (6: 1) (P)EA 2.00025 496 6002REMOV STR (INLET)EA 21.00026 496 6004REMOV STR (SET)EA 110.00027 496 6007REMOV STR (PIPE)LF 7,861.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00030 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 193.00031 506 6011ROCK FILTER DAMS (REMOVE)LF 193.00032 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 352.00033 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 352.00034 764 6007STORM SEWER CLEANING (PIPE)(12"-18"DIA)LF 848.00035 764 6008STORM SEWER CLEANING (PIPE)(19"-24"DIA)LF 4,341.00036 764 6009STORM SEWER CLEANING (PIPE)(25"-30"DIA)LF 2,077.00037 764 6010STORM SEWER CLEANING (PIPE)(31"-36"DIA)LF 1,785.00038 764 6011STORM SEWER CLEANING (PIPE)(37"-42"DIA)LF 96.00039 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 293.00040 61856002TMA (STATIONARY)DAY 312.00041 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: RAILROAD FORCE ACCOUNT WORK (PART) $17,280.00 RAILROAD FORCE ACCOUNT WORK (PART) $17,280.00