COUNTY: LA SALLE HIGHWAY: IH 35 LENGTH: 10.2120MI CONTROL NUMBER: 0018-01-093 DBE GOAL: 6.0 % PROJECT NUMBER: NH 2019(164) TYPE: BASE, SEAL COAT, PAV MRKS TIME FOR COMPLETION: 497 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM NOVEMBER 07, 2018*EST.COST: 11,119,058.09 BIDS WILL BE OPENED: 1:00 PM NOVEMBER 07, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJOSE FRANCO III ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2001 N. FIRST STREET 200 E RIVERSIDECARRIZO SPRINGS, TX 78834 AUSTIN TX 78704-1204830/876-2535 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 133 (WFR) LIMITS TO: 0.30 MI N BI-35 WFR (COCHINA RD INT ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 478.0801 104 6009REMOVING CONC (RIPRAP)SY 188.9402 105 6071REMOVING STAB BASE & ASPH PAV (5" - 6")SY 117,125.5903 110 6001EXCAVATION (ROADWAY)CY 35,593.8104 112 6002SUBGRADE WIDENING (DENS CONT)STA 478.0805 132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY 22,007.3706 150 6002BLADINGHR 82.0007 160 6004FURNISHING AND PLACING TOPSOIL (6")SY 203,386.0008 164 6033DRILL SEEDING (PERM) (RURAL) (SANDY)SY 203,386.0009 164 6041DRILL SEEDING (TEMP) (WARM)SY 203,386.00010 216 6001PROOF ROLLINGHR 100.57011 247 6060FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)CY 56,994.21012 275 6001CEMENTTON 2,885.33013 275 6035CEMENT TREAT (NEW BASE)(12")SY 170,982.62014 310 6012PRIME COAT (RC-250)GAL 33,188.99015 316 6251AGGR(TY-PE GR-5 SAC-B)CY 1,276.50016 340 6011D-GR HMA(SQ) TY-B PG64-22TON 2,107.19017 344 6063SUPERPAVE MIXTURES SP-C SAC-A PG76-22TON 19,156.28018 354 6045PLANE ASPH CONC PAV (2")SY 5,669.06019 360 6006CONC PVMT (CONT REINF - CRCP) (12")SY 7,673.75020 402 6001TRENCH EXCAVATION PROTECTIONLF 77.00021 403 6001TEMPORARY SPL SHORINGSF 1,150.00022 432 6010RIPRAP (CONC)(CL B)(5 IN)CY 62.10023 432 6045RIPRAP (MOW STRIP)(4 IN)CY 349.54024 451 6024RETROFIT RAIL (TY SSTR)LF 819.00025 462 6004CONC BOX CULV (4 FT X 3 FT)LF 4.71026 462 6007CONC BOX CULV (5 FT X 3 FT)LF 35.53027 462 6020CONC BOX CULV (8 FT X 5 FT)LF 32.50028 464 6005RC PIPE (CL III)(24 IN)LF 999.00029 466 6181WINGWALL (PW - 1) (HW=6 FT)EA 1.00030 466 6182WINGWALL (PW - 1) (HW=7 FT)EA 2.00031 466 6183WINGWALL (PW - 1) (HW=8 FT)EA 1.00032 467 6144SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)EA 1.00033 467 6182SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)EA 1.00034 467 6183SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)EA 9.00035 467 6280SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)EA 5.00036 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 32.00037 496 6004REMOV STR (SET)EA 14.00038 496 6005REMOV STR (WINGWALL)EA 26.00039 496 6006REMOV STR (HEADWALL)EA 13.00040 496 6007REMOV STR (PIPE)LF 482.00041 496 6008REMOV STR (BOX CULVERT)LF 58.90042 500 6001MOBILIZATIONLS 1.00043 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 24.00044 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 700.00045 506 6024CONSTRUCTION EXITS (REMOVE)SY 700.00046 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 101.00047 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 4,040.00048 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 4,040.00049 510 6001ONE-WAY TRAF CONT (FLAGGER CONT)HR 3,592.00050 510 6002ONE-WAY TRAF CONT (PILOT CAR)HR 1,784.00051 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 5.00052 512 6072PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)LF 2,100.00053 512 6074PTB (MOVE)(SGL SLP)(TY 1) OR (STL)LF 10,440.00054 512 6076PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)LF 2,100.00055 530 6004DRIVEWAYS (CONC)SY 792.50056 530 6005DRIVEWAYS (ACP)SY 2,953.00057 533 6001RUMBLE STRIPS (SHOULDER)LF 89,057.00058 533 6002RUMBLE STRIPS (CENTERLINE)LF 42,359.00059 540 6001MTL W-BEAM GD FEN (TIM POST)LF 5,175.00060 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00061 542 6001REMOVE METAL BEAM GUARD FENCELF 3,657.00062 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 21.00063 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 9.00064 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 28.00065 545 6005CRASH CUSH ATTEN (REMOVE)EA 4.00066 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 4.00067 560 6007MAILBOX INSTALL-S (WC-POST) TY 3EA 4.00068 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 39.00069 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 13.00070 644 6017IN SM RD SN SUP&AM TY10BWG(2)SA(P)EA 1.00071 644 6076REMOVE SM RD SN SUP&AMEA 48.00072 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 10.00073 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 7.00074 658 6067INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2EA 101.00075 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 228,422.00076 662 6016WK ZN PAV MRK NON-REMOV (W)24"(SLD)LF 440.00077 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 8,760.00078 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 303,410.00079 662 6050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA 3,529.00080 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 51.00081 666 6102REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)EA 18.00082 666 6182REFL PAV MRK TY II (W) 24" (SLD)LF 51.00083 666 6199REFL PAV MRK TY II (W) 36" (YLD TRI)EA 18.00084 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 95,401.00085 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 4,375.00086 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 72,474.00087 666 6323RE PM W/RET REQ TY II (W) 4" (SLD)LF 95,401.00088 666 6326RE PM W/RET REQ TY II (Y) 4" (BRK)LF 4,375.00089 666 6327RE PM W/RET REQ TY II (Y) 4" (SLD)LF 72,474.00090 672 6009REFL PAV MRKR TY II-A-AEA 1,232.00091 678 6001PAV SURF PREP FOR MRK (4")LF 172,250.00092 678 6008PAV SURF PREP FOR MRK (24")LF 51.00093 678 6023PAV SURF PREP FOR MRK (36")(YLD TRI)EA 18.00094 678 6033PAV SURF PREP FOR MRK (RPM)EA 1,232.00095 785 6011BRIDGE JOINT REPLACEMENT (SEJ)LF 304.00096 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 6.00097 61206001DEAD END ROADWAY BARRICADELF 96.00098 61856005TMA (MOBILE OPERATION)DAY 398.00099 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $102,660.00