COUNTY: WILLIAMSON HIGHWAY: IH 35 LENGTH: 0.10MI CONTROL NUMBER: 0015-08-140 DBE GOAL: 3.0 % PROJECT NUMBER: NH 1802(398) TYPE: STRCT, GRADING, HMACP TIME FOR COMPLETION: WORKING DAYS BY CONTRACTOR **GUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 11, 2018*EST.COST: 7,123,809.85 BIDS WILL BE OPENED: 1:00 PM JULY 11, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBOBBY RAMTHUN ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2727 S AUSTIN AVENUE 200 E RIVERSIDEGEORGETOWN, TX 78626 AUSTIN TX 78704-1204512/930-5402 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT CR 305 LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 43.0001 104 6009REMOVING CONC (RIPRAP)SY 524.0002 104 6023REMOVING CONC (CTB)LF 337.0003 105 6037REMOVING STAB BASE AND ASPH PAV(0"-16")SY 9,225.0004 106 6001OBLITERATING ABANDONED ROADSTA 9.0005 110 6001EXCAVATION (ROADWAY)CY 11,431.0006 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 51,618.0007 158 6002SPEC EXCAV WORK (BACKHOE)HR 30.0008 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 61,610.0009 164 6035DRILL SEEDING (PERM) (RURAL) (CLAY)SY 61,610.00010 164 6041DRILL SEEDING (TEMP) (WARM)SY 36,083.00011 164 6043DRILL SEEDING (TEMP) (COOL)SY 36,082.00012 168 6001VEGETATIVE WATERINGMG 1,953.00013 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 3,674.00014 216 6001PROOF ROLLINGHR 10.00015 247 6366FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)CY 6,084.00016 260 6001LIME (HYDRATED LIME (DRY))TON 148.00017 260 6073LIME TRT (SUBGRADE)(8")SY 10,225.00018 310 6001PRIME COAT (MULTI OPTION)GAL 4,328.00019 341 6008D-GR HMA TY-B PG64-22TON 4,118.00020 341 6042D-GR HMA TY-D SAC-B PG70-22TON 2,060.00021 341 6043D-GR HMA TY-D PG70-22TON 963.00022 400 6005CEM STABIL BKFLCY 381.40023 403 6001TEMPORARY SPL SHORINGSF 3,373.00024 403 6002TEMPORARY SPL SHORING (SOIL NAIL)SF 1,175.00025 416 6001DRILL SHAFT (18 IN)LF 272.00026 416 6004DRILL SHAFT (36 IN)LF 1,120.00027 420 6013CL C CONC (ABUT)CY 166.00028 420 6029CL C CONC (CAP)CY 46.00029 420 6037CL C CONC (COLUMN)CY 62.00030 420 6074CL C CONC (MISC)CY 2.00031 422 6001REINF CONC SLABSF 24,963.00032 422 6013BRIDGE SIDEWALKSF 4,259.00033 422 6015APPROACH SLABCY 153.30034 423 6001RETAINING WALL (MSE)SF 11,806.00035 423 6003RETAINING WALL (TEMP WALL)SF 7,447.00036 425 6039PRESTR CONC GIRDER (TX54)LF 3,346.32037 432 6001RIPRAP (CONC)(4 IN)CY 57.00038 432 6008RIPRAP (CONC)(CL B)(RR8&RR9)CY 66.00039 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 7.00040 432 6044RIPRAP (CONC)(FLUME)CY 35.00041 432 6045RIPRAP (MOW STRIP)(4 IN)CY 107.70042 442 6007STR STEEL (MISC NON - BRIDGE)LB 306.00043 450 6023RAIL (TY SSTR)LF 1,042.00044 450 6034RAIL (TY C402)LF 586.60045 454 6001SEALED EXPANSION JOINT (4 IN) (SEJ - A)LF 183.90046 464 6003RC PIPE (CL III)(18 IN)LF 292.00047 464 6005RC PIPE (CL III)(24 IN)LF 112.00048 467 6359SET (TY II) (18 IN) (RCP) (4: 1) (P)EA 2.00049 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 6.00050 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 4.00051 496 6007REMOV STR (PIPE)LF 120.00052 496 6010REMOV STR (BRIDGE 100 - 499 FT LENGTH)EA 1.00053 500 6001MOBILIZATIONLS 1.00054 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 22.00055 506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF 40.00056 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 30.00057 506 6011ROCK FILTER DAMS (REMOVE)LF 70.00058 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 224.00059 506 6024CONSTRUCTION EXITS (REMOVE)SY 224.00060 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 11,413.00061 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 11,413.00062 508 6001CONSTRUCTING DETOURSSY 5,665.00063 512 6021PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF 80.00064 512 6045PORT CTB (STKPL)(LOW PROF)(TY 1)LF 80.00065 512 6065PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)LF 7,910.00066 512 6079PORT CTB (STKPL)(SAFETY SH)LF 7,910.00067 514 6001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 162.00068 514 6003PERM CTB (SGL SLOPE) (TY 3) (42 )LF 175.00069 530 6005DRIVEWAYS (ACP)SY 1,048.00070 530 6009TURNOUTS (SURF TREAT)SY 39.00071 540 6001MTL W-BEAM GD FEN (TIM POST)LF 1,394.00072 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00073 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 3.00074 542 6001REMOVE METAL BEAM GUARD FENCELF 2,810.00075 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 4.00076 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00077 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 5.00078 545 6001CRASH CUSH ATTEN (INSTL)EA 7.00079 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.00080 545 6005CRASH CUSH ATTEN (REMOVE)EA 7.00081 556 6006PIPE UNDERDRAINS (TY 6) (6")LF 486.00082 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 3.00083 610 6104IN RD IL (U/P) (TY 1) (150W EQ) LEDEA 4.00084 618 6046CONDT (PVC) (SCH 80) (2")LF 259.00085 618 6053CONDT (PVC) (SCH 80) (3")LF 4,065.00086 618 6062CONDT (RM) (3/4")LF 132.00087 624 6010GROUND BOX TY D (162922)W/APRONEA 20.00088 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 48.00089 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 4.00090 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 2.00091 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 2.00092 644 6064IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)EA 2.00093 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 40.00094 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 20.00095 662 6001WK ZN PAV MRK NON-REMOV (W)4"(BRK)LF 375.00096 662 6004WK ZN PAV MRK NON-REMOV (W)4"(SLD)LF 9,900.00097 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 8,350.00098 662 6060WK ZN PAV MRK REMOV (W)4"(BRK)LF 150.00099 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 7,550.000100 662 6075WK ZN PAV MRK REMOV (W)24"(SLD)LF 173.000101 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 9,000.000102 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 1,060.000103 666 6041REFL PAV MRK TY I (W)12"(SLD)(090MIL)LF 471.000104 666 6047REFL PAV MRK TY I (W)24"(SLD)(090MIL)LF 264.000105 666 6053REFL PAV MRK TY I (W)(ARROW)(090MIL)EA 4.000106 666 6077REFL PAV MRK TY I (W)(WORD)(090MIL)EA 4.000107 666 6140REFL PAV MRK TY I (Y)12"(SLD)(090MIL)LF 348.000108 666 6147REFL PAV MRK TY I (Y)24"(SLD)(100MIL)LF 287.000109 666 6299RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)LF 615.000110 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 5,280.000111 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 9,303.000112 672 6007REFL PAV MRKR TY I-CEA 65.000113 672 6008REFL PAV MRKR TY I-REA 32.000114 672 6009REFL PAV MRKR TY II-A-AEA 168.000115 677 6001ELIM EXT PAV MRK & MRKS (4")LF 275.000116 677 6007ELIM EXT PAV MRK & MRKS (24")LF 60.000117 50006001GEOGRID REINFORCE EMBANKMENTS (TY A)SY 1,500.000118 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 4.000119 61856001TMA (STATIONARY)EA 4.000120 ROAD USER COST 800 6001NO. OF WORKING DAYS$/D 3,000.000121 ** THE NO. OF WORKING DAYS OF 263.000 WILL BE USED ONLY FOR BID COMPARISON AND AS A DEDUCTION OR AS A CREDIT IN ACCORDANCE WITH ITEM 8. THE ESTIMATED COST OF THIS CONTRACT DOES NOT INCLUDE THIS COST. * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $120,000.00