COUNTY: PARKER HIGHWAY: IH 20 LENGTH: 12.20MI CONTROL NUMBER: 0008-03-141, ETCSBE GOAL: 0.0 % PROJECT NUMBER: C 8-3-141, ETC TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 299 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 01, 2024*EST.COST: 13,457,777.30 BIDS WILL BE OPENED: 1:00 PM OCTOBER 01, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONKOREY COBURN ATTN: CONSTRUCTION DIVISION - M1C3.02 2281 E WASHINGTON 6230 E. STASSNEY LANESTEPHENVILLE, TX 76401 AUSTIN TX 78744-3147254/459-7028 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ PARKER0008-03-141US 180 IH 20C 8-3-141FM 1187 LENGTH: 6.10 MILES PARKER0314-07-082CLEAR LAKE IH 20C 314-7-82US 180 LENGTH: 6.10 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 7002PREPARING ROWSTA 556.0001 104 7005REMOV CONC (MOWSTRIP)LF 58,820.0002 110 7001EXCAV (ROADWAY)CY 500.0003 132 7003EMBANK (FNL)(OC)(TY B)CY 1,400.0004 134 7001BACKFILL (TY A)STA 1,112.0005 305 7001SALV, HAUL & STKPL RECLM ASPH PAVCY 19.0006 420 7052CL C CONC (RAIL FOUNDATION)CY 762.0007 432 7013RIPRAP (MOW STRIP)(4 IN)CY 1,983.0008 450 7051RAIL (TY T80PP)LF 4,282.0009 500 7001MOBILIZATIONLS 1.00010 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00011 503 7001PORTABLE CHANGEABLE MESSAGE SIGNDAY 697.00012 505 7001TMA (STATIONARY)DAY 584.00013 506 7039TEMP SEDMT CONT FENCE (INSTALL)LF 180.00014 506 7041TEMP SEDMT CONT FENCE (REMOVE)LF 180.00015 506 7044BIODEG EROSN CONT LOGS (INSTL) (12")LF 460.00016 506 7046BIODEG EROSN CONT LOGS (REMOVE)LF 460.00017 512 7005PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF 52,710.00018 512 7017PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)LF 2,460.00019 512 7029PORT CTB (MOVE)(F-SHAPE)(TY 1)LF 12,060.00020 512 7041PORT CTB (STKPL)(F-SHAPE)(TY 1)LF 3,300.00021 540 7001MTL W-BEAM GD FEN (TIM POST)LF 375.00022 540 7015DOWNSTREAM ANCHOR TERMINAL SECTIONEA 3.00023 542 7001REMOVE METAL BEAM GUARD FENCELF 4,601.00024 542 7003REMOVE DOWNSTREAM ANCHOR TERMINALEA 19.00025 543 7018CABLE BARRIER TERM SEC (INSTL)(TL-4)EA 2.00026 543 7037CABLE BARRIER (REMOVE)LF 52,951.00027 543 7038CABLE BARRIER TERMINAL SECTION (REMOVE)EA 14.00028 544 7001GUARDRAIL END TREATMENT (INSTALL)EA 2.00029 544 7003GUARDRAIL END TREATMENT (REMOVE)EA 18.00030 545 7002CRASH CUSH ATTEN (MOVE & RESET)EA 21.00031 545 7004CRASH CUSH ATTEN (REMOVE)EA 4.00032 545 7010CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)EA 24.00033 658 7013INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)EA 27.00034 658 7026INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF(BI)EA 9.00035 658 7032INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)EA 585.00036 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $210,000.00