Tabulation of Bids for Project STP 1702(807)MM

Last Update: Tuesday, October 31, 2017
Text version of this page
County:MONTGOMERYLet Date:08/09/17
Type:WIDEN 2 LANES TO 4 LANES UNDIVIDEDSeq No:3211
Time:53 WORKING DAYSProject ID:STP 1702(807)MM
Highway:SH 75Contract #:08173211
Length:0.720CCSJ:0110-04-129
Limits: 
From:GLADSTELL STREETCheck:$28,000
To:IH 45 UNDERPASSMisc Cost:$4,000.00
Estimate$1,447,452.75% Over/UnderCompany
Bidder 1$1,126,255.63-22.19%SMITH & COMPANY
Bidder 2$1,167,908.37-19.31%CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
Bidder 3$1,355,729.55-6.34%ANGEL BROTHERS HOLDINGS CORP.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA37.9901,700.001
2
3
150.000
450.000
300.000
1106001EXCAVATION (ROADWAY)CY1,020.0009.751
2
3
15.000
22.500
20.000
1126001SUBGRADE WIDENING (ORD COMP)STA37.990750.001
2
3
100.000
400.000
1,200.000
1326005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY314.00020.001
2
3
10.000
26.750
16.000
1346001BACKFILL (TY A)STA37.990220.001
2
3
244.000
350.000
350.000
1626002BLOCK SODDINGSY8,125.0002.801
2
3
4.000
4.000
3.500
1646051DRILL SEED (TEMP)(WARM OR COOL)SY8,125.0000.151
2
3
0.330
0.320
0.850
1666001FERTILIZERAC3.400700.001
2
3
867.000
850.000
800.000
1686001VEGETATIVE WATERINGMG402.90017.501
2
3
10.000
5.000
27.000
2926002ASPHALT STAB BASE (GR 2)(PG 64)TON1,208.00065.001
2
3
65.000
75.000
79.000
3056009SALV, HAUL & STKPL RCL APH PV (4 TO 8")SY2,842.0003.001
2
3
4.000
5.500
5.000
3106021PRIME COAT & BLOTTER (MC-30)GAL5,421.0004.501
2
3
3.500
0.500
4.000
3166001ASPH (MULTI OPTION)GAL8,386.0004.001
2
3
2.300
2.750
2.750
3166224AGGR(TY-PB GR-4 SAC-B)CY210.000100.001
2
3
94.000
112.000
165.000
3416043D-GR HMA TY-D PG70-22TON2,690.00085.001
2
3
71.000
72.000
88.000
3416064D-GR HMA TY-D PG 70-22 (LEVEL-UP)TON2,690.00075.001
2
3
71.000
72.000
73.250
3516002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY2,097.00025.001
2
3
49.000
36.000
30.000
3546021PLANE ASPH CONC PAV(0" TO 2")SY1,564.00025.001
2
3
2.500
1.500
3.750
3546024PLANE ASPH CONC PAV(2" TO 4")SY19,516.0002.601
2
3
2.350
1.500
2.500
4006005CEM STABIL BKFLCY106.00040.001
2
3
127.000
125.000
134.000
4326045RIPRAP (MOW STRIP)(4 IN)CY70.000500.001
2
3
500.000
500.000
535.000
4626002CONC BOX CULV (3 FT X 3 FT)LF131.000125.001
2
3
295.000
290.000
310.000
4646003RC PIPE (CL III)(18 IN)LF32.00060.001
2
3
76.000
75.000
80.000
4646005RC PIPE (CL III)(24 IN)LF8.00060.001
2
3
153.000
150.000
160.000
4666150WINGWALL (FW - 0) (HW=3 FT)EA2.00011,000.001
2
3
3,570.000
3,500.000
3,800.000
4666151WINGWALL (FW - 0) (HW=4 FT)EA1.00011,000.001
2
3
5,100.000
5,000.000
5,300.000
4666152WINGWALL (FW - 0) (HW=5 FT)EA1.00012,000.001
2
3
6,120.000
6,000.000
6,400.000
4796001ADJUSTING MANHOLESEA5.000500.001
2
3
510.000
1,250.000
1,350.000
4966004REMOV STR (SET)EA5.0001,000.001
2
3
1,020.000
500.000
525.000
4966005REMOV STR (WINGWALL)EA4.0001,200.001
2
3
1,020.000
1,000.000
1,100.000
4966008REMOV STR (BOX CULVERT)LF112.00040.001
2
3
76.000
75.000
80.000
5006001MOBILIZATIONLS1.000150,000.001
2
3
29,000.000
65,000.000
130,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO4.0004,200.001
2
3
600.000
4,000.000
3,700.000
5066034002CONSTRUCTION PERIMETER FENCELF3,741.0005.501
2
3
2.000
2.000
3.500
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF646.0006.001
2
3
3.500
3.500
2.500
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF646.0001.001
2
3
1.000
1.000
2.500
5306002INTERSECTIONS (ACP)SY637.00070.001
2
3
35.000
28.300
24.000
5306004DRIVEWAYS (CONC)SY616.00075.001
2
3
100.000
100.000
65.000
5306005DRIVEWAYS (ACP)SY1,001.00070.001
2
3
37.000
28.300
33.000
5406001MTL W-BEAM GD FEN (TIM POST)LF612.50025.001
2
3
20.000
19.450
21.000
5406014SHORT RADIUSLF200.00050.001
2
3
25.550
25.050
27.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,500.001
2
3
2,210.000
2,166.000
2,300.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA20.000475.001
2
3
300.000
280.000
300.000
6446004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA3.000575.001
2
3
475.000
545.000
600.000
6446007IN SM RD SN SUP&AM TY10BWG(1)SA(U)EA1.000700.001
2
3
449.000
545.000
600.000
6446076REMOVE SM RD SN SUP&AMEA28.000125.001
2
3
77.000
75.000
80.000
6626008WK ZN PAV MRK NON-REMOV (W)6"(SLD)LF52,488.0000.201
2
3
0.170
0.170
0.200
6626012WK ZN PAV MRK NON-REMOV (W)8"(SLD)LF300.0000.301
2
3
0.310
0.300
0.300
6626017WK ZN PAV MRK NON-REMOV (W)(ARROW)EA1.00050.001
2
3
51.000
50.000
55.000
6626024WK ZN PAV MRK NON-REMOV (W)(SYMBOL)EA1.00050.001
2
3
51.000
50.000
55.000
6626029WK ZN PAV MRK NON-REMOV(W)(WORD)EA1.00050.001
2
3
82.000
80.000
90.000
6626035WK ZN PAV MRK NON-REMOV (Y)6"(BRK)LF6,180.0000.151
2
3
0.180
0.180
0.200
6666036REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF100.0001.501
2
3
1.000
1.000
1.100
6666048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF21.0005.251
2
3
6.000
6.000
6.500
6666054REFL PAV MRK TY I (W)(ARROW)(100MIL)EA1.000125.001
2
3
153.000
150.000
160.000
6666078REFL PAV MRK TY I (W)(WORD)(100MIL)EA1.000125.001
2
3
184.000
180.000
200.000
6666306RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)LF2,060.0000.451
2
3
0.560
0.550
0.600
6666309RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)LF8,308.0000.401
2
3
0.510
0.500
0.550
6666321RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)LF9,188.0000.401
2
3
0.510
0.500
0.550
6726007REFL PAV MRKR TY I-CEA5.0005.001
2
3
4.000
4.000
4.250
6726009REFL PAV MRKR TY II-A-AEA295.0004.501
2
3
4.000
4.000
4.250
6786002PAV SURF PREP FOR MRK (6")LF19,556.0000.051
2
3
0.040
0.040
0.050
6786004PAV SURF PREP FOR MRK (8")LF100.0000.051
2
3
0.100
0.100
0.110
6786008PAV SURF PREP FOR MRK (24")LF21.0000.301
2
3
0.260
0.250
0.300
6786009PAV SURF PREP FOR MRK (ARROW)EA1.0006.001
2
3
15.000
15.000
16.000
6786016PAV SURF PREP FOR MRK (WORD)EA1.0006.001
2
3
15.000
15.000
16.000
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY240.00050.001
2
3
55.000
60.000
80.000