Tabulation of Bids for Project STP 1802(315)HES

Last Update: Tuesday, October 02, 2018
Text version of this page
County:WILBARGERLet Date:07/10/18
Type:IMPROVE GUARDRAIL TO DESIGN STANDARDSSeq No:3026
Time:68 WORKING DAYSProject ID:STP 1802(315)HES
Highway:US 287Contract #:07183026
Length:4.410CCSJ:0043-07-111
Limits: 
From:FM 1763Check:$11,000
To:SH 240Misc Cost:$5,000.00
Estimate$528,706.00% Over/UnderCompany
Bidder 1$524,560.00-0.78%IIPL USA LLC
Bidder 2$560,477.00+6.01%HJC FARMS, INC.
Bidder 3$690,465.00+30.60%FNH CONSTRUCTION, LLC
Bidder 4$1,041,925.00+97.07%GILVIN-TERRILL, LTD.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1046009REMOVING CONC (RIPRAP)SY1,341.00025.001
2
3
4
25.000
10.000
20.000
30.000
1056074REMOVING STAB BASE AND ASPH PAV (4")SY295.0005.001
2
3
4
18.000
10.000
20.000
30.000
1326019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY196.00025.001
2
3
4
30.000
30.000
30.000
50.000
1646021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY1,860.0001.251
2
3
4
1.000
0.200
1.500
2.000
1686001VEGETATIVE WATERINGMG31.20015.001
2
3
4
100.000
50.000
250.000
430.000
4206066CL C CONC (RAIL FOUNDATION)CY5.6001,200.001
2
3
4
1,000.000
1,000.000
2,000.000
3,000.000
4326045RIPRAP (MOW STRIP)(4 IN)CY286.000500.001
2
3
4
400.000
650.000
525.000
1,500.000
4506004RAIL (TY T221)LF40.00050.001
2
3
4
300.000
250.000
185.000
600.000
5006001MOBILIZATIONLS1.00046,973.001
2
3
4
50,000.000
20,000.000
65,000.000
100,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO4.0003,000.001
2
3
4
5,000.000
2,000.000
8,500.000
9,000.000
5406001MTL W-BEAM GD FEN (TIM POST)LF5,500.00020.001
2
3
4
20.000
22.600
22.500
20.000
5406006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA22.0001,800.001
2
3
4
1,600.000
2,100.000
1,850.000
2,000.000
5406016DOWNSTREAM ANCHOR TERMINAL SECTIONEA11.0001,000.001
2
3
4
1,200.000
1,050.000
1,500.000
1,200.000
5406018MTL BM GD FEN TRANS (NON - SYM)EA3.000700.001
2
3
4
1,200.000
1,050.000
1,500.000
1,200.000
5426001REMOVE METAL BEAM GUARD FENCELF5,525.0002.001
2
3
4
1.000
2.000
3.000
3.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA11.000250.001
2
3
4
200.000
200.000
500.000
500.000
5426004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA8.0001,100.001
2
3
4
200.000
200.000
1,500.000
500.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA29.0002,400.001
2
3
4
2,500.000
2,775.000
2,500.000
2,750.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA29.000200.001
2
3
4
200.000
200.000
1,250.000
500.000
6586013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA61.00028.001
2
3
4
10.000
20.000
100.000
12.000
6586026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA61.00028.001
2
3
4
10.000
20.000
100.000
12.000
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA83.00028.001
2
3
4
15.000
30.000
100.000
15.000
6586064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA85.00028.001
2
3
4
15.000
30.000
100.000
15.000
61856002TMA (STATIONARY)DAY65.000100.001
2
3
4
300.000
200.000
250.000
1,000.000