Tabulation of Bids for Project STP 1802(311)

Last Update: Tuesday, October 02, 2018
Text version of this page
County:TOM GREENLet Date:07/10/18
Type:ACP OVERLAYSeq No:3008
Time:54 WORKING DAYSProject ID:STP 1802(311)
Highway:US 67Contract #:07183008
Length:11.222CCSJ:0077-06-099
Limits: 
From:CHAPEL HILL DRIVECheck:$69,000
To:IRION COUNTY LINEMisc Cost:$1,000.00
Estimate$3,383,897.57% Over/UnderCompany
Bidder 1$3,463,806.62+2.36%REECE ALBERT, INC.
Bidder 2$4,279,774.57+26.47%RK HALL, LLC
Bidder 3$4,548,407.12+34.41%JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1346004BACKFILL (TY A OR B)STA593.000177.001
2
3
149.870
136.650
50.000
3156004FOG SEAL (CSS-1H)GAL3,555.0004.001
2
3
3.450
3.140
3.000
3446048001SUPERPAVE MIXTURES SP-C SAC-B PG70-22TON35,239.00076.001
2
3
85.730
98.950
105.250
3546021PLANE ASPH CONC PAV(0" TO 2")SY11,247.0004.001
2
3
2.420
2.370
3.000
4326045RIPRAP (MOW STRIP)(4 IN)CY29.000550.001
2
3
781.190
495.000
550.000
5006001MOBILIZATIONLS1.000221,000.001
2
3
77,666.480
349,791.330
300,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO3.00015,000.001
2
3
2,734.170
15,000.000
5,000.000
5306008TURNOUTS (ACP)SY97.00030.001
2
3
21.580
91.630
16.000
5336001RUMBLE STRIPS (SHOULDER)LF118,502.0000.151
2
3
0.070
0.120
0.270
5336002RUMBLE STRIPS (CENTERLINE)LF59,251.0000.301
2
3
0.070
0.130
0.270
5406002MTL W-BEAM GD FEN (STEEL POST)LF400.00030.001
2
3
31.810
27.500
30.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,950.001
2
3
3,236.360
3,300.000
2,500.000
6586015INSTL DEL ASSM (D-SW)SZ (BRF)GF1EA24.00021.001
2
3
22.320
33.000
75.000
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA1,597.0003.001
2
3
2.640
1.930
2.000
6626111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA5,925.0003.001
2
3
2.660
1.930
4.000
6666005007REFL PAV MRK TY I (W)4"(DOT)(090MIL)LF913.0000.851
2
3
1.120
0.300
0.540
6666035007REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF2,404.0000.751
2
3
0.610
0.590
0.800
6666167007REFL PAV MRK TY II (W) 4" (BRK)LF4,567.0000.151
2
3
0.110
0.140
0.540
6666170007REFL PAV MRK TY II (W) 4" (SLD)LF122,398.0000.131
2
3
0.110
0.140
0.540
6666178007REFL PAV MRK TY II (W) 8" (SLD)LF2,404.0000.251
2
3
0.220
0.290
0.800
6666205007REFL PAV MRK TY II (Y) 4" (BRK)LF7,488.0000.151
2
3
0.110
0.140
0.540
6666207007REFL PAV MRK TY II (Y) 4" (SLD)LF81,130.0000.151
2
3
0.110
0.140
0.540
6666299007RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)LF4,567.0000.351
2
3
0.330
0.300
0.540
6666302007RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF122,398.0000.311
2
3
0.310
0.300
0.540
6666311007RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF7,488.0000.351
2
3
0.320
0.300
0.540
6666314007RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF81,130.0000.311
2
3
0.310
0.300
0.540
6686077PREFAB PAV MRK TY C (W) (ARROW)EA6.000235.001
2
3
245.520
330.000
150.000
6686083PREFAB PAV MRK TY C (W) (LNDP ARROW)EA6.000500.001
2
3
574.730
605.000
150.000
6686085PREFAB PAV MRK TY C (W) (WORD)EA3.000265.001
2
3
290.160
385.000
150.000
6726007REFL PAV MRKR TY I-CEA107.0003.501
2
3
4.460
3.300
4.000
6726009REFL PAV MRKR TY II-A-AEA1,940.0003.501
2
3
3.960
3.300
4.000
7306107003FULL - WIDTH MOWINGCYC1.0004,015.001
2
3
6,428.080
11,092.240
2,000.000
7346002LITTER REMOVALCYC1.0002,117.001
2
3
4,017.560
21,748.070
650.000
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY170.000100.001
2
3
39.390
106.750
100.000
61856002TMA (STATIONARY)DAY92.000300.001
2
3
168.650
215.810
650.000
61856005TMA (MOBILE OPERATION)DAY18.000600.001
2
3
268.460
719.380
400.000