Tabulation of Bids for Project NH 2018(823)

Last Update: Tuesday, July 31, 2018
Text version of this page
County:WILBARGERLet Date:05/01/18
Type:MILL HOT MIX ON BRIDGE AND APPROACHESSeq No:3050
Time:102 WORKING DAYSProject ID:NH 2018(823)
Highway:US 70Contract #:05183050
Length:1.942CCSJ:0043-06-088
Limits: 
From:AT BNSF RAILROAD & DUGAN CREEK (NB)Check:$31,000
To:.Misc Cost:$10,000.00
Estimate$1,703,073.01% Over/UnderCompany
Bidder 1$1,693,704.50-0.55%SILVER CREEK CONSTRUCTION, INC.
Bidder 2$1,864,296.40+9.47%EARTH BUILDERS, L.P.
Bidder 3$1,949,722.50+14.48%GILVIN-TERRILL, LTD.
Bidder 4$1,974,598.75+15.94%SCR CIVIL CONSTRUCTION, LLC
Bidder 5$2,007,555.50+17.88%A. L. HELMCAMP, INC.
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1106001EXCAVATION (ROADWAY)CY106.00015.001
2
3
4
5
30.000
50.000
200.000
65.000
22.000
1646033DRILL SEEDING (PERM) (RURAL) (SANDY)SY973.0000.501
2
3
4
5
1.500
3.000
2.000
1.650
5.000
1686001VEGETATIVE WATERINGMG79.00030.001
2
3
4
5
50.000
80.000
33.000
73.000
40.000
3406138D-GR HMA(SQ) TY-D PG76-22TON1,439.000150.001
2
3
4
5
110.000
130.000
189.000
205.000
175.000
3546004PLAN & TEXT ASPH CONC PAV(0" TO 4")SY467.0005.001
2
3
4
5
9.000
10.000
4.000
17.900
14.000
3546010PLAN & TEXT ASPH CONC PAV(0" TO 6")SY6,167.0006.001
2
3
4
5
9.000
7.000
5.000
9.000
8.000
3546195PLANE ASPH CONC PAV (0" TO 9")SY6,405.00010.001
2
3
4
5
10.000
7.000
5.000
10.050
9.000
4206066CL C CONC (RAIL FOUNDATION)CY48.870600.001
2
3
4
5
1,200.000
500.000
675.000
4,950.000
600.000
4296007CONC STR REPAIR (VERTICAL & OVERHEAD)SF20.000150.001
2
3
4
5
150.000
200.000
700.000
200.000
350.000
4326045RIPRAP (MOW STRIP)(4 IN)CY112.000550.001
2
3
4
5
350.000
500.000
515.000
900.000
500.000
4516024RETROFIT RAIL (TY SSTR)LF2,098.000150.001
2
3
4
5
150.000
260.000
154.000
178.000
170.000
5006001MOBILIZATIONLS1.000137,575.511
2
3
4
5
163,000.000
170,000.000
190,000.000
197,000.000
190,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO6.0006,000.001
2
3
4
5
7,500.000
3,000.000
25,000.000
10,800.000
14,000.000
5066040002BIODEG EROSN CONT LOGS (INSTL) (8")LF200.0005.001
2
3
4
5
4.000
6.000
4.000
4.200
10.000
5126072PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)LF1,550.00070.001
2
3
4
5
35.000
38.000
57.000
30.000
100.000
5126074PTB (MOVE)(SGL SLP)(TY 1) OR (STL)LF1,550.00010.001
2
3
4
5
14.000
12.000
3.000
9.000
10.000
5126076PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)LF1,550.00020.001
2
3
4
5
10.000
10.000
5.000
22.000
28.000
5406001MTL W-BEAM GD FEN (TIM POST)LF1,925.00020.001
2
3
4
5
23.000
21.000
20.000
22.350
23.000
5406006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA4.0002,000.001
2
3
4
5
1,575.000
1,400.000
1,480.000
1,765.000
2,000.000
5406016DOWNSTREAM ANCHOR TERMINAL SECTIONEA2.0001,200.001
2
3
4
5
1,275.000
800.000
980.000
1,100.000
1,000.000
5406018MTL BM GD FEN TRANS (NON - SYM)EA2.000900.001
2
3
4
5
775.000
500.000
550.000
615.000
1,000.000
5426001REMOVE METAL BEAM GUARD FENCELF2,000.00020.001
2
3
4
5
4.000
2.500
2.000
2.000
4.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA2.000400.001
2
3
4
5
110.000
150.000
175.000
200.000
350.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA4.0002,450.001
2
3
4
5
2,225.000
2,400.000
2,100.000
2,350.000
2,900.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA4.000250.001
2
3
4
5
250.000
250.000
200.000
225.000
350.000
5456001CRASH CUSH ATTEN (INSTL)EA2.00010,000.001
2
3
4
5
8,000.000
9,000.000
13,100.000
9,000.000
11,000.000
5456003CRASH CUSH ATTEN (MOVE & RESET)EA2.0001,500.001
2
3
4
5
1,000.000
3,000.000
1,500.000
2,000.000
1,500.000
5456005CRASH CUSH ATTEN (REMOVE)EA2.0001,500.001
2
3
4
5
1,000.000
2,000.000
3,000.000
2,000.000
1,000.000
6586013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA10.00040.001
2
3
4
5
28.000
10.000
25.000
25.000
25.000
6586026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA10.00040.001
2
3
4
5
28.000
10.000
25.000
25.000
25.000
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA12.00040.001
2
3
4
5
42.000
25.000
25.000
30.000
45.000
6586064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA7.00040.001
2
3
4
5
42.000
25.000
30.000
30.000
45.000
6626063WK ZN PAV MRK REMOV (W)4"(SLD)LF9,830.0001.751
2
3
4
5
1.000
1.200
3.000
3.350
1.000
6626095WK ZN PAV MRK REMOV (Y)4"(SLD)LF5,110.0001.751
2
3
4
5
1.000
1.200
3.000
3.350
1.000
6626109WK ZN PAV MRK SHT TERM (TAB)TY WEA228.0001.001
2
3
4
5
2.500
2.300
1.500
2.000
1.000
6666036007REFL PAV MRK TY I (W)8"(SLD)(100MIL)LF189.0001.001
2
3
4
5
2.500
3.000
3.250
2.800
3.000
6666300007RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF1,250.0000.501
2
3
4
5
1.000
1.000
2.000
1.400
1.100
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF3,040.0000.501
2
3
4
5
1.000
1.000
2.000
1.400
1.000
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF3,040.0000.501
2
3
4
5
1.000
1.000
2.000
1.400
1.000
6726010REFL PAV MRKR TY II-C-REA63.0005.001
2
3
4
5
6.500
8.000
5.000
5.600
7.500
6776001ELIM EXT PAV MRK & MRKS (4")LF1,250.0001.001
2
3
4
5
2.000
2.500
3.000
3.350
2.000
7856010BRIDGE JOINT REPLACEMENT (ARMOR)LF548.000265.001
2
3
4
5
325.000
320.000
175.000
154.000
360.000
7856011BRIDGE JOINT REPLACEMENT (SEJ)LF944.000350.001
2
3
4
5
375.000
365.000
180.000
184.000
360.000
61856001TMA (STATIONARY)EA2.0001,000.001
2
3
4
5
15,000.000
5,000.000
90,000.000
18,000.000
10,000.000
61856003TMA (MOBILE OPERATION)HR48.00040.001
2
3
4
5
100.000
100.000
2,300.000
95.000
70.000