The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | KAUFMAN | Let Date: | 04/03/19 |
Type: | REHABILITATE EXISTING PAVMENT AND SLOPE FAIL RPR | Seq No: | 3222 |
Time: | 96 WORKING DAYS | Project ID: | STP 2019(719) |
Highway: | SH 274 | Contract #: | 04193222 |
Length: | 6.192 | CCSJ: | 0561-01-024 |
Limits: | |||
From: | HENDERSON COUNTY LINE | Check: | $75,000 |
To: | US 175 | Misc Cost: | $98,137.00 |
Estimate | $3,733,824.66 | % Over/Under | Company |
Bidder 1 | $3,753,154.82 | +0.52% | TEXAS MATERIALS GROUP, INC. |
Bidder 2 | $3,869,773.09 | +3.64% | ED BELL CONSTRUCTION COMPANY |
Bidder 3 | $4,103,770.70 | +9.91% | EAST TEXAS BRIDGE, INC. |
Bidder 4 | $4,182,119.69 | +12.01% | A. L. HELMCAMP, INC. |
Bidder 5 | $4,667,115.02 | +25.00% | LONGVIEW BRIDGE AND ROAD, LTD. |
Bidder 6 | $5,080,832.55 | +36.08% | FNH CONSTRUCTION, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 52.000 | 2,500.00 | 1 2 3 4 5 6 | 1,230.000 1,575.000 1,000.000 600.000 1,250.000 6,500.000 |
1056105 | REMOVING STAB BASE AND ASPH PAV(15") | SY | 3,280.000 | 6.75 | 1 2 3 4 5 6 | 10.250 11.000 10.000 12.000 7.000 20.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 10,000.000 | 7.20 | 1 2 3 4 5 6 | 12.500 10.000 10.000 11.000 15.000 17.500 |
1326005 | EMBANKMENT (FINAL)(ORD COMP)(TY C) | CY | 10,000.000 | 11.55 | 1 2 3 4 5 6 | 16.000 10.000 10.000 18.000 18.000 25.000 |
1346004 | BACKFILL (TY A OR B) | STA | 320.000 | 140.00 | 1 2 3 4 5 6 | 183.000 150.000 300.000 180.000 210.000 250.000 |
1616017 | COMPOST MANUF TOPSOIL (4") | SY | 19,360.000 | 0.70 | 1 2 3 4 5 6 | 0.950 0.800 2.000 1.150 3.000 2.500 |
1626002 | BLOCK SODDING | SY | 19,360.000 | 3.00 | 1 2 3 4 5 6 | 3.300 3.150 4.000 4.000 4.250 4.000 |
1646051 | DRILL SEED (TEMP)(WARM OR COOL) | SY | 6,446.000 | 0.70 | 1 2 3 4 5 6 | 0.420 0.100 0.400 0.600 0.280 1.000 |
1686001 | VEGETATIVE WATERING | MG | 1,969.000 | 5.00 | 1 2 3 4 5 6 | 0.010 1.050 8.000 10.000 11.500 25.000 |
2476053003 | FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) | CY | 1,185.000 | 72.00 | 1 2 3 4 5 6 | 66.000 57.500 45.000 65.000 90.000 90.000 |
3446032001 | SUPERPAVE MIXTURES SP-C SAC-B PG64-22 | TON | 18,267.000 | 80.00 | 1 2 3 4 5 6 | 85.000 87.500 95.000 95.000 100.000 98.000 |
3446172 | SUPERPAVE MIXTURES SP-C PG64-22(LEV-UP) | TON | 1,030.000 | 78.00 | 1 2 3 4 5 6 | 93.300 101.000 115.000 113.000 116.000 140.000 |
3516021 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(13") | SY | 7,000.000 | 120.00 | 1 2 3 4 5 6 | 75.000 84.000 105.000 85.000 120.000 75.000 |
3546045 | PLANE ASPH CONC PAV (2") | SY | 165,942.000 | 1.25 | 1 2 3 4 5 6 | 1.340 1.420 1.500 1.600 2.150 2.500 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 74.000 | 450.00 | 1 2 3 4 5 6 | 600.000 630.000 475.000 700.000 480.000 500.000 |
5006001 | MOBILIZATION | LS | 1.000 | 280,000.00 | 1 2 3 4 5 6 | 298,000.000 380,000.000 200,000.000 400,000.000 365,000.000 500,000.000 |
5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 5.000 | 8,500.00 | 1 2 3 4 5 6 | 15,745.000 21,000.000 6,000.000 18,000.000 4,500.000 8,500.000 |
5066001004 | ROCK FILTER DAMS (INSTALL) (TY 1) | LF | 126.000 | 24.00 | 1 2 3 4 5 6 | 29.000 22.840 33.000 40.000 23.000 30.000 |
5066011004 | ROCK FILTER DAMS (REMOVE) | LF | 126.000 | 5.00 | 1 2 3 4 5 6 | 10.000 10.500 10.000 7.500 7.700 15.000 |
5066020004 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 250.000 | 20.00 | 1 2 3 4 5 6 | 16.000 22.050 26.000 10.000 22.250 40.000 |
5066024004 | CONSTRUCTION EXITS (REMOVE) | SY | 250.000 | 5.00 | 1 2 3 4 5 6 | 8.000 11.550 10.000 2.000 9.000 20.000 |
5066038004 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 6,085.000 | 1.70 | 1 2 3 4 5 6 | 1.500 1.470 3.500 2.500 1.850 4.000 |
5066039004 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 6,085.000 | 0.40 | 1 2 3 4 5 6 | 0.440 0.110 1.000 1.000 0.550 2.000 |
5336003 | RUMBLE STRIPS (SHOULDER) ASPHALT | LF | 49,826.000 | 0.10 | 1 2 3 4 5 6 | 0.130 0.090 0.300 0.200 0.170 0.250 |
5336004 | RUMBLE STRIPS (CENTERLINE) ASPHALT | LF | 24,913.000 | 0.16 | 1 2 3 4 5 6 | 0.180 0.090 0.300 0.200 0.170 0.250 |
5406001 | MTL W-BEAM GD FEN (TIM POST) | LF | 2,339.000 | 19.00 | 1 2 3 4 5 6 | 20.000 19.340 23.000 18.250 22.000 20.000 |
5406005 | TERMINAL ANCHOR SECTION | EA | 16.000 | 1,800.00 | 1 2 3 4 5 6 | 2,650.000 2,651.250 3,000.000 960.000 2,750.000 1,500.000 |
5406021 | MTL THRIE-BEAM GD FEN (TIM POST) | EA | 4.000 | 1,929.00 | 1 2 3 4 5 6 | 1,395.000 1,401.750 1,800.000 1,710.000 1,500.000 1,500.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 2,339.000 | 2.70 | 1 2 3 4 5 6 | 3.050 3.150 3.000 2.100 2.500 3.000 |
5426002 | REMOVE TERMINAL ANCHOR SECTION | EA | 16.000 | 215.00 | 1 2 3 4 5 6 | 235.000 236.250 250.000 270.000 220.000 850.000 |
6446068 | RELOCATE SM RD SN SUP&AM TY 10BWG | EA | 11.000 | 400.00 | 1 2 3 4 5 6 | 525.000 472.500 700.000 375.000 825.000 550.000 |
6626004 | WK ZN PAV MRK NON-REMOV (W)4"(SLD) | LF | 63,056.000 | 0.18 | 1 2 3 4 5 6 | 0.350 0.370 0.380 0.370 0.380 0.400 |
6626034 | WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | LF | 63,056.000 | 0.18 | 1 2 3 4 5 6 | 0.350 0.370 0.380 0.370 0.380 0.400 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 655.000 | 0.95 | 1 2 3 4 5 6 | 1.020 2.100 2.000 0.510 1.200 5.000 |
6626110 | WK ZN PAV MRK SHT TERM (TAB)TY Y | EA | 2,526.000 | 0.95 | 1 2 3 4 5 6 | 1.020 2.100 2.000 0.510 1.200 5.000 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 1,265.000 | 0.75 | 1 2 3 4 5 6 | 1.050 1.050 1.100 1.050 1.100 6.000 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 180.000 | 4.70 | 1 2 3 4 5 6 | 5.750 5.780 6.000 5.780 6.000 20.000 |
6666054007 | REFL PAV MRK TY I (W)(ARROW)(100MIL) | EA | 11.000 | 106.00 | 1 2 3 4 5 6 | 145.000 147.000 150.000 147.000 155.000 250.000 |
6666078007 | REFL PAV MRK TY I (W)(WORD)(100MIL) | EA | 11.000 | 130.00 | 1 2 3 4 5 6 | 185.000 189.000 200.000 189.000 200.000 250.000 |
6666224 | PAVEMENT SEALER 4" | LF | 3,760.000 | 0.80 | 1 2 3 4 5 6 | 0.520 0.530 0.550 0.530 0.550 1.000 |
6666300007 | RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | LF | 21,016.000 | 0.15 | 1 2 3 4 5 6 | 0.500 0.500 0.540 0.500 0.520 0.500 |
6666303007 | RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | LF | 64,936.000 | 0.12 | 1 2 3 4 5 6 | 0.420 0.420 0.450 0.420 0.440 0.500 |
6666315007 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 64,936.000 | 0.30 | 1 2 3 4 5 6 | 0.420 0.420 0.450 0.420 0.440 0.500 |
6726007 | REFL PAV MRKR TY I-C | EA | 724.000 | 3.45 | 1 2 3 4 5 6 | 3.450 3.470 4.000 3.500 3.650 15.000 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 449.000 | 2.70 | 1 2 3 4 5 6 | 3.450 3.470 4.000 3.500 3.650 15.000 |
6776001 | ELIM EXT PAV MRK & MRKS (4") | LF | 3,760.000 | 0.45 | 1 2 3 4 5 6 | 1.050 1.050 1.100 1.100 1.100 0.500 |
6786001 | PAV SURF PREP FOR MRK (4") | LF | 3,760.000 | 0.35 | 1 2 3 4 5 6 | 0.260 0.260 0.300 0.250 0.280 0.500 |
61856001 | TMA (STATIONARY) | EA | 3.000 | 5,000.00 | 1 2 3 4 5 6 | 14,000.000 7,350.000 30,000.000 15,000.000 15,000.000 15,000.000 |
61856003 | TMA (MOBILE OPERATION) | HR | 264.000 | 80.00 | 1 2 3 4 5 6 | 57.000 10.500 30.000 40.000 11.000 85.000 |