Tabulation of Bids for Project BR 2013(300)

Last Update: Wednesday, July 03, 2019

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:DALLASLet Date:04/02/19
Type:REPLACE BRIDGE AND APPROACHESSeq No:3015
Time:132 WORKING DAYSProject ID:BR 2013(300)
Highway:CSContract #:04193015
Length:0.109CCSJ:0918-47-062
Limits: 
From:ON THIRD ST AT KELLER BRANCHCheck:$15,000
To:IN CITY OF LANCASTERMisc Cost:$36,780.00
Estimate$734,229.45% Over/UnderCompany
Bidder 1$793,042.00+8.01%HODGES AND SON CONSTRUCTION COMPANY, INC.
Bidder 2$798,999.40+8.82%PIERCE R & B LLC
Bidder 3$889,322.02+21.12%MCMAHON CONTRACTING, L.P.
Bidder 4$983,712.50+33.98%GHB EQUIPMENT COMPANY, L.L.C.
Bidder 5$1,045,322.50+42.37%STATELINE CONSTRUCTION, LLC
Bidder 6$1,057,622.50+44.05%FNH CONSTRUCTION, LLC
Bidder 7$1,096,195.05+49.30%ED BELL CONSTRUCTION COMPANY
Bidder 8$1,188,723.38+61.90%FUQUA CONSTRUCTION CO., INC.
Bidder 9$1,251,867.00+70.50%IOWA BRIDGE & CULVERT, LC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA5.8003,000.001
2
3
4
5
6
7
8
9
2,600.000
3,000.000
3,070.480
8,000.000
4,500.000
13,500.000
18,000.000
3,002.964
10,000.000
1056005REMOVING STAB BASE AND ASPH PAV (3")SY1,138.00010.001
2
3
4
5
6
7
8
9
12.000
8.000
8.680
17.000
11.000
20.000
8.000
3.034
9.000
1066001OBLITERATING ABANDONED ROADSTA2.9005,000.001
2
3
4
5
6
7
8
9
5,000.000
1,000.000
1,685.320
7,000.000
8,500.000
10,000.000
600.000
576.494
5,000.000
1106001EXCAVATION (ROADWAY)CY580.00015.001
2
3
4
5
6
7
8
9
15.000
20.000
27.140
40.000
22.000
20.000
25.000
6.698
50.000
1106002EXCAVATION (CHANNEL)CY426.00016.001
2
3
4
5
6
7
8
9
12.000
24.000
30.310
40.000
31.000
30.000
25.000
7.435
50.000
1326006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY243.00025.001
2
3
4
5
6
7
8
9
12.000
32.000
28.540
60.000
31.000
30.000
25.000
7.814
100.000
1616017COMPOST MANUF TOPSOIL (4")SY1,805.0002.001
2
3
4
5
6
7
8
9
3.000
4.000
7.250
3.000
3.500
6.000
3.000
1.080
2.000
1626002BLOCK SODDINGSY1,805.0005.001
2
3
4
5
6
7
8
9
4.000
7.500
6.150
7.000
6.000
8.000
3.000
3.118
6.000
1646051DRILL SEED (TEMP)(WARM OR COOL)SY1,805.0000.251
2
3
4
5
6
7
8
9
1.000
2.900
2.030
1.000
1.000
2.000
0.050
0.082
2.000
1686001VEGETATIVE WATERINGMG538.00025.001
2
3
4
5
6
7
8
9
1.000
25.000
30.000
50.000
25.000
20.000
3.000
12.555
15.000
2476312003FL BS (CMP IN PLC)(TY D GR1-2)(8")SY1,380.00019.001
2
3
4
5
6
7
8
9
45.000
27.000
15.370
30.000
38.000
25.000
25.000
11.282
50.000
3106027PRIME COAT(MC-30 OR AE-P)GAL260.0009.001
2
3
4
5
6
7
8
9
14.000
14.500
15.430
9.000
9.000
10.000
14.000
3.238
8.000
3166024ASPH (CRS-2P)GAL217.00011.001
2
3
4
5
6
7
8
9
12.000
11.000
11.450
11.000
15.000
20.000
10.500
3.472
18.000
3166029ASPH (RC-250)GAL122.00019.001
2
3
4
5
6
7
8
9
20.000
20.000
21.180
11.000
22.000
60.000
19.750
4.040
65.000
3166403AGGR (TY-B GR-5 OR TY-L GR-5)CY5.000450.001
2
3
4
5
6
7
8
9
1,000.000
930.000
986.000
350.000
1,100.000
3,150.000
900.000
89.527
3,500.000
3166419ASPH (AC-15P, AC-20-5TR OR AC-20XP)GAL182.00020.001
2
3
4
5
6
7
8
9
14.000
13.250
13.850
140.000
22.000
55.000
12.500
3.664
52.000
3166440AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)CY10.000580.001
2
3
4
5
6
7
8
9
1,000.000
825.000
881.600
350.000
1,100.000
1,650.000
800.000
121.678
1,700.000
3446032001SUPERPAVE MIXTURES SP-C SAC-B PG64-22TON144.000158.001
2
3
4
5
6
7
8
9
185.000
190.000
204.160
150.000
215.000
225.000
190.000
87.814
230.000
4006005CEM STABIL BKFLCY74.600148.001
2
3
4
5
6
7
8
9
250.000
225.000
215.920
200.000
325.000
235.000
250.000
65.725
350.000
4166004DRILL SHAFT (36 IN)LF286.000230.001
2
3
4
5
6
7
8
9
190.000
181.000
309.500
350.000
275.000
200.000
300.000
165.322
500.000
4206014CL C CONC (ABUT)(HPC)CY41.8001,000.001
2
3
4
5
6
7
8
9
1,000.000
1,100.000
936.070
800.000
1,100.000
900.000
1,500.000
977.916
1,300.000
4206030CL C CONC (CAP)(HPC)CY13.6001,000.001
2
3
4
5
6
7
8
9
1,000.000
1,500.000
1,680.880
800.000
1,450.000
950.000
1,500.000
1,020.595
1,350.000
4206038CL C CONC (COLUMN)(HPC)CY3.1001,000.001
2
3
4
5
6
7
8
9
1,200.000
1,900.000
1,860.450
1,200.000
2,100.000
950.000
3,000.000
791.856
1,500.000
4226002REINF CONC SLAB (HPC)SF4,200.00025.001
2
3
4
5
6
7
8
9
20.000
20.000
28.920
27.000
26.750
15.000
27.000
19.175
26.000
4226016APPROACH SLAB (HPC)CY53.400500.001
2
3
4
5
6
7
8
9
500.000
625.000
568.600
350.000
785.000
800.000
600.000
505.736
600.000
4256036PRESTR CONC GIRDER (TX34)LF555.900130.001
2
3
4
5
6
7
8
9
195.000
164.000
186.550
200.000
265.000
150.000
300.000
142.367
250.000
4326001RIPRAP (CONC)(4 IN)CY48.000500.001
2
3
4
5
6
7
8
9
450.000
525.000
548.930
350.000
590.000
500.000
500.000
376.200
500.000
4326031RIPRAP (STONE PROTECTION)(12 IN)CY50.000125.001
2
3
4
5
6
7
8
9
130.000
140.000
184.830
220.000
185.000
135.000
304.890
108.371
250.000
4326045RIPRAP (MOW STRIP)(4 IN)CY20.000470.001
2
3
4
5
6
7
8
9
500.000
500.000
607.960
450.000
590.000
500.000
500.000
431.259
500.000
4506007RAIL (TY T223)(HPC)LF316.000100.001
2
3
4
5
6
7
8
9
110.000
110.000
138.970
60.000
125.000
135.000
200.000
117.251
150.000
4546001SEALED EXPANSION JOINT (4 IN) (SEJ - A)LF60.30092.001
2
3
4
5
6
7
8
9
75.000
100.000
89.410
90.000
110.000
50.000
60.000
89.271
100.000
4646001RC PIPE (CL III)(12 IN)LF68.00056.001
2
3
4
5
6
7
8
9
65.000
55.000
82.740
90.000
65.000
65.000
75.000
40.801
115.000
4646005RC PIPE (CL III)(24 IN)LF25.00061.001
2
3
4
5
6
7
8
9
120.000
75.000
133.100
125.000
125.000
85.000
125.000
67.469
150.000
4676326SET (TY II) (12 IN) (RCP) (6: 1) (P)EA6.000660.001
2
3
4
5
6
7
8
9
2,500.000
800.000
1,104.320
1,200.000
750.000
1,500.000
750.000
606.047
1,750.000
4676395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA2.0001,260.001
2
3
4
5
6
7
8
9
3,000.000
1,200.000
2,090.320
1,500.000
1,150.000
1,850.000
950.000
1,138.943
2,275.000
4966007REMOV STR (PIPE)LF98.00025.001
2
3
4
5
6
7
8
9
5.000
15.000
13.270
40.000
50.000
30.000
21.000
15.817
50.000
4966009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA1.00027,000.001
2
3
4
5
6
7
8
9
12,000.000
20,000.000
14,701.960
25,000.000
19,500.000
120,000.000
25,000.000
19,024.688
50,000.000
5006001MOBILIZATIONLS1.00065,348.001
2
3
4
5
6
7
8
9
75,000.000
79,000.000
86,298.200
90,000.000
90,000.000
100,000.000
109,966.650
625,875.515
125,186.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO7.0002,200.001
2
3
4
5
6
7
8
9
1,500.000
2,990.000
999.570
2,500.000
5,800.000
3,000.000
5,000.000
6,859.199
3,000.000
5066002002ROCK FILTER DAMS (INSTALL) (TY 2)LF32.00040.001
2
3
4
5
6
7
8
9
40.000
43.000
46.400
100.000
40.000
30.000
31.500
28.095
30.000
5066011002ROCK FILTER DAMS (REMOVE)LF32.00015.001
2
3
4
5
6
7
8
9
20.000
15.000
13.920
20.000
20.000
15.000
15.750
8.014
15.000
5066020002CONSTRUCTION EXITS (INSTALL) (TY 1)SY146.00015.001
2
3
4
5
6
7
8
9
5.000
15.000
16.240
100.000
20.000
40.000
21.000
19.848
22.000
5066024002CONSTRUCTION EXITS (REMOVE)SY146.0008.001
2
3
4
5
6
7
8
9
1.000
9.000
9.280
10.000
12.000
20.000
10.500
6.980
11.000
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF1,175.0002.501
2
3
4
5
6
7
8
9
2.000
1.570
1.620
7.000
3.000
4.000
1.520
2.339
5.000
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF1,175.0001.001
2
3
4
5
6
7
8
9
1.000
0.510
0.490
2.000
1.000
2.000
0.110
0.637
1.000
5406001MTL W-BEAM GD FEN (TIM POST)LF212.50020.001
2
3
4
5
6
7
8
9
20.000
22.000
30.160
23.000
25.000
25.000
20.000
20.852
22.000
5406007MTL BEAM GD FEN TRANS (TL2)EA4.000915.001
2
3
4
5
6
7
8
9
1,000.000
1,100.000
1,276.000
1,500.000
1,450.000
1,850.000
795.000
1,131.971
1,000.000
5406014SHORT RADIUSLF25.00030.001
2
3
4
5
6
7
8
9
30.000
55.000
87.000
53.000
45.000
35.000
22.000
29.921
27.000
5406015DRIVEWAY TERMINAL ANCHOR SECTIONEA1.000650.001
2
3
4
5
6
7
8
9
750.000
1,150.000
1,160.000
1,500.000
1,450.000
1,850.000
600.000
805.713
725.000
5426001REMOVE METAL BEAM GUARD FENCELF150.0002.501
2
3
4
5
6
7
8
9
2.000
2.500
13.920
5.000
3.000
3.000
2.150
2.572
5.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA4.000213.001
2
3
4
5
6
7
8
9
400.000
225.000
290.000
1,000.000
500.000
500.000
105.000
217.869
220.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA3.0002,570.001
2
3
4
5
6
7
8
9
2,400.000
2,750.000
2,958.000
3,000.000
2,850.000
2,850.000
2,625.000
2,571.394
2,500.000
5606011MAILBOX INSTALL-S (TWW-POST) TY 4EA1.000330.001
2
3
4
5
6
7
8
9
400.000
400.000
348.000
200.000
650.000
650.000
315.000
254.419
275.000
6446060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA14.000305.001
2
3
4
5
6
7
8
9
450.000
600.000
522.000
250.000
900.000
650.000
550.000
354.770
415.000
6586014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA6.00025.001
2
3
4
5
6
7
8
9
40.000
30.000
32.480
77.000
45.000
100.000
20.000
21.451
22.000
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA19.00030.001
2
3
4
5
6
7
8
9
40.000
40.000
52.200
77.000
45.000
100.000
37.000
27.623
22.000
6666224007PAVEMENT SEALER 4"LF750.0000.551
2
3
4
5
6
7
8
9
2.000
1.150
0.060
4.000
2.000
2.000
1.050
0.083
3.000
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF956.0001.501
2
3
4
5
6
7
8
9
4.000
1.700
1.450
2.000
3.000
2.000
1.600
0.270
3.000
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF1,160.0001.501
2
3
4
5
6
7
8
9
4.000
1.700
1.450
2.000
3.000
2.000
1.600
0.283
3.000
6786001PAV SURF PREP FOR MRK (4")LF2,116.0000.301
2
3
4
5
6
7
8
9
2.500
1.100
0.060
1.000
2.000
2.000
1.050
0.040
3.000