500 2001 - 512 2051
512 2052 - 529 6001
529 6002 - 531 6005
531 6006 - 542 6001
542 6002 - 556 6009
556 6010 - 585 6001
Item NoDescriptionUnitsSept 30, 2018Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
500 2001MOBILIZATIONLS  62.000315,195.5725862
500 6001MOBILIZATIONLS50.000844,986.80760893.915550,523.38297893
500 6033MOBILIZATION (CALLOUT)EA  12.0001,000.000001
500 6034MOBILIZATION (EMERGENCY)EA  5.0002,500.000001
502 2001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO  562.0006,827.3466062
502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO510.5006,217.062259,269.4766,349.51321891
502 6002BARR, SIGNS, TRAFFIC HANDLING ADD ALT1MO  7.0005,960.020001
502 6015FURN ADDITIONAL TRUCKMOUNT ATTENUATORHR  300.00075.000001
502 6024FURNISH ADDITIONAL ARROW BOARDHR  300.0008.000001
502 6025BARR, SIGNS, TRAFFIC HANDLINGEA34.0005,500.0000098.0003,377.551023
506 2001ROCK FILTER DAMS (INSTALL) (TY 1)LF  8,003.00012.8759113
506 2002ROCK FILTER DAMS (INSTALL) (TY 2)LF  5,025.00030.9780010
506 2003ROCK FILTER DAMS (INSTALL) (TY 3)LF  799.00038.594494
506 2009ROCK FILTER DAMS (REMOVE)LF  10,547.0005.0858622
506 2011TEMPORARY PIPE SLOPE DRAINS (12")LF  100.00019.340001
506 2013BALED HAYEA  4,394.0006.003642
506 2016CONSTRUCTION EXITS (INSTALL) (TY 1)SY  4,156.00012.0004912
506 2017CONSTRUCTION EXITS (INSTALL) (TY 2)SY  234.00021.080001
506 2018CONSTRUCTION EXITS (INSTALL) (TY 3)SY  182.00017.000001
506 2019CONSTRUCTION EXITS (REMOVE)SY  4,572.0005.4270313
506 2022EARTHWORK (ERSN & SEDM CONT, IN VEH)CY  786.00022.718833
506 2024BACKHOE WORK (EROSION & SEDM CONT)HR  354.00065.141245
506 2026FRNT END LOADER WORK (ERSN & SEDM CONTHR  230.5002.000001
506 2027BLADING WORK (EROSION & SEDM CONT)HR  151.000134.867552
506 2029BULLDOZER WORK (EROSION & SEDM CONT)HR  1.000115.000001
506 2031SANDBAGS FOR EROSION CONTROLEA  2,349.0007.648153
506 2032SANDBAGS FOR EROSION CONTROL (18")LF  76.0004.000001
506 2033SANDBAGS FOR EROSION CONTROL (2')LF  104.0006.073462
506 2034TEMPORARY SEDIMENT CONTROL FENCELF  189,961.0002.0617839
506 2035BIODEGRADABLE EROSION CONTROL LOGS(18"LF  1,257.0003.460001
506 2041TEMP SDMT CONT FENCE (INLET PROTECT)LF  200.0002.110001
506 2045BIODEGRADABLE EROSION CONTROL LOGS(12"LF  500.0007.000001
506 6001ROCK FILTER DAMS (INSTALL) (TY 1)LF1,143.00025.1338662,017.00027.69041112
506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF6,052.00029.79296147,823.00028.08098197
506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF800.00049.0000016,723.00054.5518543
506 6004ROCK FILTER DAMS (INSTALL) (TY 4)LF  3,709.00033.1124916
506 6005ROCK FILTER DAMS (INSTALL) (TY 5)LF  815.00027.693253
506 6006ROCK FILTER DAMS (INSTALL) (TY 1)CY28.00078.0000028.00078.000001
506 6007ROCK FILTER DAMS (INSTALL) (TY 2)CY  86.00075.000001
506 6011ROCK FILTER DAMS (REMOVE)LF7,995.0008.43627223,671.0008.08855319
506 6012ROCK FILTER DAMS (REMOVE)CY28.00038.00000114.00020.649122
506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY9,928.00023.05763130,975.22019.95372211
506 6021CONSTRUCTION EXITS (INSTALL) (TY 2)SY5,850.0008.0000021,167.28025.0015818
506 6022CONSTRUCTION EXITS (INSTALL) (TY 3)SY  2,340.00031.796175
506 6024CONSTRUCTION EXITS (REMOVE)SY15,778.0005.81478151,424.5007.00503228
506 6025EXCAV (EROSN & SEDMT CONT, IN PLACE)CY615.00025.00000615.00025.000001
506 6026EMBANK (EROSN & SEDMT CONT, IN PLACE)CY307.00025.00000307.00025.000001
506 6027EXCAV (EROSN & SEDMT CONT, IN VEH)CY  224.00020.000001
506 6029EARTHWORK (EROSN & SEDMT CONT, IN VEH)CY250.00020.000007,567.00021.8864818
506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR202.00084.653474,445.15086.4678944
506 6031FRNT END LOADER WORK (ERSN & SEDM CONTHR  326.00065.684487
506 6033BULLDOZER WORK (EROSION & SEDMT CONT)HR  159.000140.000001
506 6034CONSTRUCTION PERIMETER FENCELF31,476.0003.25000101,639.0002.4895825
506 6035SANDBAGS FOR EROSION CONTROLEA  26,409.0003.8264122
506 6036SANDBAGS FOR EROSION CONTROL (6")LF  3,277.5006.655233
506 6037SANDBAGS FOR EROSION CONTROL (12")LF  448.0007.267864
506 6038TEMP SEDMT CONT FENCE (INSTALL)LF295,274.0002.019583,099,219.0002.28995503
506 6039TEMP SEDMT CONT FENCE (REMOVE)LF295,274.000.669593,099,494.000.64408503
506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF2,294.0003.67284164,851.0003.63187100
506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF111,578.0003.52798483,121.0003.53135181
506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF6,370.0006.38595267,452.0004.54825115
506 6043BIODEG EROSN CONT LOGS (REMOVE)LF120,641.000.78064904,851.000.80230348
506 6045BIODEG EROSN CONT LOGS (INSTL) (6")LF1,100.0005.870008,603.0001.602874
506 6046TRACKHOE WORK (EROSION & SEDMT CONT)HR  1,130.000130.530979
506 6047TEMP SDMT CONT FENCE (INLET PROTECTIONLF  8,562.0005.831945
508 2001CONSTRUCTING DETOURSSTA  75.3002,000.000001
508 2002CONSTRUCTING DETOURSSY  10,996.00045.867556
508 6001CONSTRUCTING DETOURSSY112,676.00040.362111,750,346.79244.45248125
508 6002CONSTRUCTING DETOURS (EBSS)SY  753.00096.000001
508 6003CONSTRUCTING DETOURS (TY 1)SY  126,462.00055.635197
508 6004CONSTRUCTING DETOURS (TY 2)SY  174,994.00056.523825
508 6005CONSTRUCTING DETOURS (TY 3)SY  376.00070.000001
510 2001ONE-WAY TRAFFIC CONTROLHR  600.00010.000001
510 6001ONE-WAY TRAF CONT (FLAGGER CONT)HR  11,624.00047.1430216
510 6002ONE-WAY TRAF CONT (PILOT CAR)HR2,893.00029.2406116,547.00078.5466114
510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO42.0004,566.66667331.2502,951.6958535
510 6004ONE-WAY TRAFFIC CONTROL (PORT TRAF SIGDAY  10.000515.000001
512 2001PORT CTB (FUR & INST)(SAFETY SH)(TY 1)LF  5,550.00016.120542
512 2002PORT CTB (FUR & INST)(SAFETY SH)(TY 2)LF  270.00013.000001
512 2008PORT CTB (FUR & INST)(LOW PROF)(TY 1)LF  3,100.00039.048393
512 2009PORT CTB (FUR & INST)(LOW PROF)(TY 2)LF  180.00049.131113
512 2011PORT CTB (DES SOURCE)(SAFETY SH)(TY 2)LF  50,153.0004.119873
512 2017PORT CTB (DES SOURCE)(LOW PROF)(TY 1)LF  10,860.0007.700962
512 2018PORT CTB (DES SOURCE)(LOW PROF)(TY 2)LF  440.00013.306822
512 2019PORT CTB (MOVE)(SAFETY SH)(TY 1)LF  4,740.0008.832222
512 2020PORT CTB (MOVE)(SAFETY SH)(TY 2)LF  45,334.0002.496035
512 2026PORT CTB (MOVE)(LOW PROF)(TY 1)LF  12,540.0007.068364
512 2027PORT CTB (MOVE)(LOW PROF)(TY 2)LF  440.00015.717273
512 2028PORT CTB (STKPL)(SAFETY SH)(TY 1)LF  960.00014.740001
512 2029PORT CTB (STKPL)(SAFETY SH)(TY 2)LF  10,980.0005.101642
512 2035PORT CTB (STKPL)(LOW PROF)(TY 1)LF  13,340.0005.975173
512 2036PORT CTB (STKPL)(LOW PROF)(TY 2)LF  460.00012.005653
512 2037PORT CTB (REMOVE)(SAFETY SH)(TY 1)LF  6,510.0003.266823
512 2038PORT CTB (REMOVE)(SAFETY SH)(TY 2)LF  25,917.0003.107302
512 2044PORT CTB (REMOVE)(LOW PROF)(TY 1)LF  600.0009.750002
512 2045PORT CTB (REMOVE)(LOW PROF)(TY 2)LF  120.00019.726672
512 2046PORT CTB(MOVE)(SAFETY SH)(TY P&P)LF  22,050.0002.990001
512 2048PORT CTB (FUR & INST)(F-SHAPE)(TY 1)LF  33,590.00034.197123
512 2050PORT CTB (MOVE)(F-SHAPE)(TY 1)LF  28,435.0001.848252
512 2051PORT CTB (STOCKPILE)(F-SHAPE)(TY 1)LF  7,710.0003.297122