AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANGELO DISTRICT

Last Update: Thursday, July 14, 2022
ITEMS 6000 6008 TO 6185 6005
ItemsItemsBid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0545
0610 - 0690
0712 - 0786
1002 - 1002
4001 - 4076
5003 - 5092
6000 - 6185
6000 6008 - 6185 6005
Item NoDescriptionUnitsMarch 31, 2019Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
6000 6008REMOVE CONDUCTORLF  1,130.0007.000001
6001 6001PORTABLE CHANGEABLE MESSAGE SIGNDAY  1,660.00088.3891610
6001 6002PORTABLE CHANGEABLE MESSAGE SIGNEA  22.00012,154.932735
6027 6003CONDUIT (PREPARE)LF  518.0004.050001
6027 6008GROUND BOX (PREPARE)EA  6.000222.570001
6049 6001LONG CHANNEL MOUNT CURB SYS (INSTALL)LF  196.00080.130001
6056 6002PREFORMED CENTERLINE RUMBLE STRIPLF4,750.0006.0500079,650.0005.551905
6120 6001DEAD END ROADWAY BARRICADELF  593.00044.369383
6185 6002TMA (STATIONARY)DAY126.000379.220004,599.000141.4381616
6185 6003TMA (MOBILE OPERATION)HR  4,045.00051.382778
6185 6005TMA (MOBILE OPERATION)DAY158.000494.40000104.000266.533653