Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | HIDALGO |
Highway | 0000000 |
From | 600 WEST ESPRESSWAY 83, PHARR, TEXAS |
To | 600 WEST ESPRESSWAY 83, PHARR, TEXAS |
CSJ | 4704-01-684 |
Proj ID | CBC - 470401684 |
Work Type | LABORATORY HVAC UPGRADE - PHARR DHQ |
|
| 0.001 | 499000.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
ALPHA BUILDING CORPORATION |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-684 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06164213 |
| Totals | 499000.00 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | 0000000 |
From | 600 WEST US EXPRESSWAY 83 PHARR TEXAS |
To | 600 WEST US EXPRESSWAY 83 PHARR TEXAS |
CSJ | 4704-01-775 |
Proj ID | CBC - 470401775 |
Work Type | PHARR DHQ ELECTRICAL AND GENERATOR UPGRA |
|
| 0.001 | 519800.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 180 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
FSG FACILITY SOLUTIONS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-775 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09164227 |
| Totals | 519800.00 | 0.00 | 0.00 | 0.0 |
|
County | CAMERON |
Highway | PR0100 |
From | CAMERON COUNTY |
To | CAMERON COUNTY |
CSJ | 6175-04-001 |
Proj ID | BPM - 617504001 |
Work Type | BPM QIC BRIDGE DECK REPAIR |
|
| 0.001 | 97702.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 40 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
GIBSON & ASSOCIATES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6175-04-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02082103 |
| Totals | 97702.00 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | US0083 |
From | HIDALGO, CAMERON, STARR AND WILLACY |
To | VARIOUS LOCATIONS |
CSJ | 6229-70-001 |
Proj ID | RMC - 622970001 |
Work Type | INSTALLATION OF HIGHWAY TRAFFIC SIGNALS |
|
| 0.010 | 915093.20 | | 1647473.23 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 02-06-12 |
Work Began | 03-26-12 |
Work Completed | 04-30-15 |
Time Computed | 03-19-12 |
Contract Working Days | 345 |
Addl Days Granted | 120 |
Working Days Charged | 524 |
Percent Time Used | 112 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6229-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01124014 |
| Totals | 915093.20 | 0.00 | 1647473.23 | 100.0 |
|
County | HIDALGO |
Highway | IH0069C |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6349-32-001 |
Proj ID | RMC - 634932001 |
Work Type | INSTALLATION OF HIGHWAY TRAFFIC SIGNALS |
|
| 0.010 | 805113.80 | | 1116129.50 | 99.9 |
Work Order | 01-03-20 |
Work Began | 11-02-20 |
Work Completed | |
Time Computed | 11-02-20 |
Contract Working Days | 220 |
Addl Days Granted | 220 |
Working Days Charged | 281 |
Percent Time Used | 63 |
Contractor(s) |
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6349-32-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12194019 |
| Totals | 805113.80 | 0.00 | 1116129.50 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6353-00-001 |
Proj ID | RMC - 635300001 |
Work Type | LARGE SIGN REPLACEMENT |
|
| | 915620.62 | | 861952.82 | 94.1 |
Work Order | 04-12-21 |
Work Began | 07-06-21 |
Work Completed | |
Time Computed | 07-06-21 |
Contract Working Days | 360 |
Addl Days Granted | 0 |
Working Days Charged | 235 |
Percent Time Used | 65 |
Contractor(s) |
TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6353-00-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03214018 |
| Totals | 915620.62 | 0.00 | 861952.82 | 94.1 |
|
County | WILLACY |
Highway | IH0069E |
From | VARIOUS LOCATIONS |
To | WILLACY COUNTY |
CSJ | 6363-38-001 |
Proj ID | BPM - 636338001 |
Work Type | HIGHWAY BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.100 | 848211.00 | | 1715666.37 | 100.0 |
Work Order | 09-18-20 |
Work Began | 10-22-20 |
Work Completed | 05-31-23 |
Time Computed | 10-22-20 |
Contract Working Days | 180 |
Addl Days Granted | 46 |
Working Days Charged | 212 |
Percent Time Used | 93 |
Contractor(s) |
LUCANIA CONSTRUCTION LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6363-38-001 PAVEMENT MARKINGS INC. (0.41) TEXAS HIGHWAY SYSTEMS, INC. (5.08)
|
Contract # | 08204207 |
| Totals | 848211.00 | 0.00 | 1715666.37 | 100.0 |
|
County | CAMERON |
Highway | BU0083S |
From | VARIOUS LOCATIONS |
To | CAMERON/ WILLACY COUNTY |
CSJ | 6365-58-001 |
Proj ID | RMC - 636558001 |
Work Type | CLEANING AND SWEEPING OF HIGHWAYS |
|
| 0.010 | 496748.24 | | 440419.50 | 89.8 |
Work Order | 09-02-20 |
Work Began | 10-05-20 |
Work Completed | |
Time Computed | 10-05-20 |
Contract Working Days | 480 |
Addl Days Granted | 0 |
Working Days Charged | 425 |
Percent Time Used | 88 |
Contractor(s) |
PAVEMENT PARTNERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6365-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07204202 |
| Totals | 496748.24 | 0.00 | 440419.50 | 89.8 |
|
County | HIDALGO |
Highway | IH0002 |
From | HIDALGO COUNTY |
To | CAMERON COUNTY |
CSJ | 6366-11-001 |
Proj ID | RMC - 636611001 |
Work Type | TRAFFIC CONTROL SERVICES |
|
| 0.010 | 571618.90 | | 603808.28 | 99.9 |
Work Order | 04-05-21 |
Work Began | 06-28-21 |
Work Completed | |
Time Computed | 06-28-21 |
Contract Working Days | 180 |
Addl Days Granted | 60 |
Working Days Charged | 224 |
Percent Time Used | 93 |
Contractor(s) |
THE LEVY COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6366-11-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03214217 |
| Totals | 571618.90 | 1941.84 | 603808.28 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | VARIOUS LOCATIONS |
To | HIDALGO, CAMERON AND WILLACY COUNTY |
CSJ | 6379-63-001 |
Proj ID | RMC - 637963001 |
Work Type | TREE TRIMMING |
|
| 0.010 | 468400.00 | | 398740.00 | 85.1 |
Work Order | 08-26-21 |
Work Began | 12-13-21 |
Work Completed | |
Time Computed | 12-13-21 |
Contract Working Days | 480 |
Addl Days Granted | 0 |
Working Days Charged | 67 |
Percent Time Used | 13 |
Contractor(s) |
SAENZ UTILITY CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6379-63-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 07214213 |
| Totals | 468400.00 | 4840.00 | 398740.00 | 85.1 |
|
County | HIDALGO |
Highway | IH0002 |
From | VARIOUS ROADWAYS IN HIDALGO COUNTY |
To | PHARR AREA REGION |
CSJ | 6379-70-001 |
Proj ID | RMC - 637970001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 881300.40 | | 1168045.20 | 99.9 |
Work Order | 09-01-21 |
Work Began | 09-01-21 |
Work Completed | |
Time Computed | 09-01-21 |
Contract Working Days | 420 |
Addl Days Granted | 210 |
Working Days Charged | 572 |
Percent Time Used | 90 |
Contractor(s) |
SWEEPING SERVICES OF TEXAS - OPERATING, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6379-70-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 05214017 |
| Totals | 881300.40 | 36939.20 | 1168045.20 | 99.9 |
|
County | CAMERON |
Highway | FM1847 |
From | CAMERON COUNTY |
To | WILLACY COUNTY |
CSJ | 6381-98-001 |
Proj ID | RMC - 638198001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 939772.05 | | 889331.75 | 100.0 |
Work Order | 07-20-21 |
Work Began | 09-08-21 |
Work Completed | 03-31-23 |
Time Computed | 09-08-21 |
Contract Working Days | 200 |
Addl Days Granted | 7 |
Working Days Charged | 209 |
Percent Time Used | 100 |
Contractor(s) |
SJ&J CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6381-98-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06214219 |
| Totals | 939772.05 | 0.00 | 889331.75 | 100.0 |
|
County | STARR |
Highway | US0083 |
From | STARR/ZAPATA COUNTY |
To | JIM HOGG/BROOKS COUNTY |
CSJ | 6382-12-001 |
Proj ID | RMC - 638212001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 696288.00 | | 512718.00 | 73.6 |
Work Order | 02-23-22 |
Work Began | 05-02-22 |
Work Completed | |
Time Computed | 05-02-22 |
Contract Working Days | 192 |
Addl Days Granted | 0 |
Working Days Charged | 54 |
Percent Time Used | 28 |
Contractor(s) |
SWEEPING CORPORATION OF AMERICA, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6382-12-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 01224220 |
| Totals | 696288.00 | 31713.00 | 512718.00 | 73.6 |
|
County | HIDALGO |
Highway | SH0495 |
From | HIDALGO COUNTY |
To | VARIOUS ROADWAYS |
CSJ | 6387-78-001 |
Proj ID | RMC - 638778001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 867782.02 | | 1081893.22 | 99.9 |
Work Order | 11-17-21 |
Work Began | 05-16-22 |
Work Completed | |
Time Computed | 05-16-22 |
Contract Working Days | 140 |
Addl Days Granted | 140 |
Working Days Charged | 112 |
Percent Time Used | 40 |
Contractor(s) |
R&M INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6387-78-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10214222 |
| Totals | 867782.02 | 0.00 | 1081893.22 | 99.9 |
|
County | HIDALGO |
Highway | IH0002 |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6392-58-001 |
Proj ID | RMC - 639258001 |
Work Type | PAVEMENT MARKINGS |
|
| 0.010 | 774068.00 | | 730819.01 | 94.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 09-19-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 240 |
Addl Days Granted | 0 |
Working Days Charged | 47 |
Percent Time Used | 19 |
Contractor(s) |
PAVEMENT MARKINGS INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6392-58-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02224019 |
| Totals | 774068.00 | 20761.60 | 730819.01 | 94.4 |
|
County | CAMERON |
Highway | IH0069E |
From | CAMERON COUNTY |
To | VARIOUS LOCATIONS |
CSJ | 6392-59-001 |
Proj ID | BPM - 639259001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 777430.00 | | 1226687.00 | 100.0 |
Work Order | 09-19-22 |
Work Began | 01-03-23 |
Work Completed | 01-31-23 |
Time Computed | 01-03-23 |
Contract Working Days | 60 |
Addl Days Granted | 20 |
Working Days Charged | 64 |
Percent Time Used | 80 |
Contractor(s) |
SJ&J CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6392-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08224204 |
| Totals | 777430.00 | 8400.00 | 1226687.00 | 100.0 |
|
County | CAMERON |
Highway | US0077 |
From | DISTRICTWIDE |
To | DISTRICTWIDE |
CSJ | 6398-71-001 |
Proj ID | RMC - 639871001 |
Work Type | DEBRIS REMOVAL |
|
| 0.010 | 696552.70 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
GLOBAL EMERGENCY SERVICES, LLC. |
SUBCONTRACTOR(S) FOR CCSJ: 6398-71-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09224202 |
| Totals | 696552.70 | 0.00 | 0.00 | 0.0 |
|
County | HIDALGO |
Highway | SH0495 |
From | DISTRICT WIDE |
To | VARIOUS COUNTIES |
CSJ | 6404-35-001 |
Proj ID | MMC - 640435001 |
Work Type | FLEXIBLE BASE |
|
| 0.010 | 334700.00 | | 662694.44 | 100.0 |
Work Order | 12-01-22 |
Work Began | 01-01-23 |
Work Completed | 12-26-23 |
Time Computed | 01-01-23 |
Contract Working Days | 120 |
Addl Days Granted | 240 |
Working Days Charged | 359 |
Percent Time Used | 99 |
Contractor(s) |
TOUCHSTONE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6404-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10224020 |
| Totals | 334700.00 | 0.00 | 662694.44 | 100.0 |
|
County | HIDALGO |
Highway | IH0069C |
From | DISTRICT WIDE |
To | VARIOUS ROADWAYS |
CSJ | 6413-69-001 |
Proj ID | RMC - 641369001 |
Work Type | INSTALLATION OF TRAFFIC SIGNALS |
|
| 0.010 | 1120663.76 | | 572295.28 | 51.0 |
Work Order | 05-22-23 |
Work Began | 05-22-23 |
Work Completed | |
Time Computed | 05-22-23 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 169 |
Percent Time Used | 46 |
Contractor(s) |
TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6413-69-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11224211 |
| Totals | 1120663.76 | 16140.70 | 572295.28 | 51.0 |
|
County | HIDALGO |
Highway | SH0336 |
From | VARIOUS ROADWAYS |
To | EDCOUCH, MISSION, AND PHARR MAINTENANCE |
CSJ | 6414-07-001 |
Proj ID | RMC - 641407001 |
Work Type | SWEEPING AND DEBRIS REMOVAL |
|
| 0.010 | 1762479.75 | | 1115650.50 | 63.3 |
Work Order | 09-21-22 |
Work Began | 10-17-22 |
Work Completed | |
Time Computed | 10-17-22 |
Contract Working Days | 480 |
Addl Days Granted | 0 |
Working Days Charged | 321 |
Percent Time Used | 66 |
Contractor(s) |
SWEEPING CORPORATION OF AMERICA, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6414-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08224232 |
| Totals | 1762479.75 | 72155.00 | 1115650.50 | 63.3 |
|