496 2009 | REMOV STR (BRIDGE 0-99 FT LENGTH) | EA | | | 4.000 | 25,000.00000 | 1 |
496 2016 | REMOV STR (PIPE) | EA | | | 11.000 | 250.00000 | 1 |
496 6002 | REMOV STR (INLET) | EA | | | 1.000 | 505.00000 | 1 |
496 6004 | REMOV STR (SET) | EA | | | 69.000 | 380.19768 | 4 |
496 6005 | REMOV STR (WINGWALL) | EA | | | 116.000 | 395.42414 | 4 |
496 6006 | REMOV STR (HEADWALL) | EA | | | 39.000 | 446.07077 | 4 |
496 6007 | REMOV STR (PIPE) | LF | | | 1,613.000 | 103.45790 | 4 |
496 6008 | REMOV STR (BOX CULVERT) | LF | | | 552.540 | 40.13356 | 2 |
496 6016 | REMOV STR (PIPE) | EA | | | 4.000 | 800.00000 | 1 |
496 6025 | REMOV STR (APPROACH SLAB) | EA | | | 2.000 | 4,000.00000 | 1 |
496 6040 | REMOV STR (RET WALL) | LF | | | 230.000 | 28.00000 | 1 |
496 6099 | REMOVE STR (RAIL) | LF | | | 106.000 | 155.00000 | 1 |