Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | WOOD |
Highway | US0080 |
From | VARIOUS LOCATIONS IN WOOD COUNTY |
To | AND VAN ZANDT COUNTY |
CSJ | 6400-26-001 |
Proj ID | RMC - 640026001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 449833.00 | | 172188.75 | 38.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-16-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 531 |
Percent Time Used | 72 |
Contractor(s) |
CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6400-26-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06224014 |
| Totals | 449833.00 | 0.00 | 172188.75 | 38.2 |
|
County | SMITH |
Highway | US0069 |
From | VARIOUS LOCATION IN SMITH COUNTY |
To | AND CHEROKEE COUNTY |
CSJ | 6400-47-001 |
Proj ID | RMC - 640047001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 517456.00 | | 264971.50 | 51.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-22 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 499 |
Percent Time Used | 68 |
Contractor(s) |
CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6400-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06224015 |
| Totals | 517456.00 | 9943.75 | 264971.50 | 51.2 |
|
County | RUSK |
Highway | US0259 |
From | VARIOUS LOCATIONS IN RUSK, |
To | HENDERSON, AND VAN ZANDT COUTIES |
CSJ | 6412-57-001 |
Proj ID | BPM - 641257001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 471298.00 | | 432554.40 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 01-23-23 |
Work Completed | 05-23-23 |
Time Computed | 00-00-00 |
Contract Working Days | 112 |
Addl Days Granted | 0 |
Working Days Charged | 109 |
Percent Time Used | 97 |
Contractor(s) |
BECK-REIT & SONS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6412-57-001 AREA WIDE PROTECTIVE, INC. (2.54)
|
Contract # | 10224023 |
| Totals | 471298.00 | 0.00 | 432554.40 | 100.0 |
|
County | SMITH |
Highway | US0069 |
From | VARIOUS LOCATIONS IN |
To | THE TYLER DISTRICT |
CSJ | 6420-81-001 |
Proj ID | RMC - 642081001 |
Work Type | TRAFFIC SIGNAL MAINTENANCE |
|
| 0.010 | 832600.00 | | 212461.00 | 25.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 04-17-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 348 |
Percent Time Used | 47 |
Contractor(s) |
TEXAS TRAFFIC CONTROL SYSTEMS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6420-81-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11224212 |
| Totals | 832600.00 | 7490.00 | 212461.00 | 25.5 |
|
County | SMITH |
Highway | SH0031 |
From | VARIOUS LOCATIONS IN |
To | THE TYLER DISTRICT |
CSJ | 6420-89-001 |
Proj ID | RMC - 642089001 |
Work Type | LARGE SIGN REPLACEMENT |
|
| 0.010 | 577920.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6420-89-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03234035 |
| Totals | 577920.00 | 0.00 | 0.00 | 0.0 |
|
County | WOOD |
Highway | US0080 |
From | VARIOUS ROADWAYS IN |
To | WOOD COUNTY |
CSJ | 6422-30-001 |
Proj ID | RMC - 642230001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 654880.07 | | 309121.39 | 100.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-01-23 |
Work Completed | 02-09-24 |
Time Computed | 00-00-00 |
Contract Working Days | 106 |
Addl Days Granted | 0 |
Working Days Charged | 71 |
Percent Time Used | 66 |
Contractor(s) |
RDA VEGETATION MANAGEMENT LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6422-30-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12224017 |
| Totals | 654880.07 | 0.00 | 309121.39 | 100.0 |
|
County | WOOD |
Highway | US0080 |
From | VARIOUS ROADWAYS IN |
To | WOOD AND VAN ZANDT COUNTIES |
CSJ | 6422-44-001 |
Proj ID | RMC - 642244001 |
Work Type | TRAFFIC CONTROL SERVICES |
|
| 0.010 | 1979844.70 | | 1290979.28 | 65.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 01-23-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 432 |
Percent Time Used | 59 |
Contractor(s) |
SOUTH TEXAS ILLUMINATION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6422-44-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11224213 |
| Totals | 1979844.70 | 95856.04 | 1290979.28 | 65.2 |
|
County | CHEROKEE |
Highway | US0069 |
From | VARIOUS ROADWAYS IN |
To | CHEROKEE COUNTY |
CSJ | 6423-17-001 |
Proj ID | RMC - 642317001 |
Work Type | TREE REMOVAL |
|
| 0.010 | 623618.00 | | 197580.00 | 31.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-04-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 322 |
Percent Time Used | 44 |
Contractor(s) |
S G COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6423-17-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12224025 |
| Totals | 623618.00 | 0.00 | 197580.00 | 31.6 |
|
County | SMITH |
Highway | US0271 |
From | VARIOUS ROADWAYS IN |
To | SMITH COUNTY |
CSJ | 6423-24-001 |
Proj ID | RMC - 642324001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 898125.48 | | 426190.26 | 47.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 102 |
Addl Days Granted | 0 |
Working Days Charged | 28 |
Percent Time Used | 27 |
Contractor(s) |
JASCO |
SUBCONTRACTOR(S) FOR CCSJ: 6423-24-001 SERVIN MOWING CONTRACTORS, LLC (100.00)
|
Contract # | 12224026 |
| Totals | 898125.48 | 0.00 | 426190.26 | 47.4 |
|
County | SMITH |
Highway | US0069 |
From | VARIOUS ROADWAYS IN |
To | SMITH COUNTY |
CSJ | 6426-20-001 |
Proj ID | RMC - 642620001 |
Work Type | TREE REMOVAL |
|
| 0.010 | 586800.00 | | 207280.00 | 35.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 04-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 364 |
Percent Time Used | 49 |
Contractor(s) |
PATTERSON'S COMPLETE TREE SERVICE LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6426-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12224039 |
| Totals | 586800.00 | 29165.00 | 207280.00 | 35.3 |
|
County | VAN ZANDT |
Highway | US0080 |
From | VARIOUS LOCATIONS IN THE CANTON MTCE |
To | IN VAN ZANDT COUNTY |
CSJ | 6430-96-001 |
Proj ID | MMC - 643096001 |
Work Type | HOT MIX |
|
| 0.010 | 1016100.00 | | 2035194.91 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 338 |
Percent Time Used | 92 |
Contractor(s) |
TEXAS MATERIALS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6430-96-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03234033 |
| Totals | 1016100.00 | 14177.52 | 2035194.91 | 99.9 |
|
County | RUSK |
Highway | US0259 |
From | HENDERSON MTCE SECTION |
To | RUSK COUNTY |
CSJ | 6430-97-001 |
Proj ID | MMC - 643097001 |
Work Type | HOT MIX |
|
| 0.010 | 1244870.00 | | 2467406.71 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-15-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 320 |
Percent Time Used | 87 |
Contractor(s) |
LONGVIEW ASPHALT, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6430-97-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03234234 |
| Totals | 1244870.00 | 100208.23 | 2467406.71 | 99.9 |
|
County | GREGG |
Highway | US0080 |
From | LONGVIEW MTCE SECTION |
To | GREGG COUNTY |
CSJ | 6430-99-001 |
Proj ID | MMC - 643099001 |
Work Type | HOT MIX |
|
| 0.010 | 1223310.00 | | 1021641.18 | 83.5 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 09-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 211 |
Percent Time Used | 57 |
Contractor(s) |
LONGVIEW ASPHALT, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6430-99-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06234037 |
| Totals | 1223310.00 | 77216.22 | 1021641.18 | 83.5 |
|
County | WOOD |
Highway | US0080 |
From | MINEOLA MTCE SECTION |
To | WOOD COUNTY |
CSJ | 6431-01-001 |
Proj ID | MMC - 643101001 |
Work Type | HOT MIX |
|
| 0.010 | 1180400.00 | | 1641108.78 | 99.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 06-05-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 299 |
Percent Time Used | 81 |
Contractor(s) |
LONGVIEW BRIDGE AND ROAD, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 6431-01-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03234032 |
| Totals | 1180400.00 | 120600.30 | 1641108.78 | 99.9 |
|
County | GREGG |
Highway | IH0020 |
From | IH 20 THROUGH GREGG, SMITH, AND |
To | VAN ZANDT COUNTIES |
CSJ | 6431-16-001 |
Proj ID | RMC - 643116001 |
Work Type | TOTAL MAINTENANCE |
|
| 0.010 | 4768998.00 | | 1279699.46 | 26.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 09-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 211 |
Percent Time Used | 28 |
Contractor(s) |
FIREMAN EXCAVATING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6431-16-001 CATOCON, INC. (1.88) SERVIN MOWING CONTRACTORS, LLC (7.07) STRIPING TECHNOLOGY, L.P. (0.00)
|
Contract # | 05234026 |
| Totals | 4768998.00 | 150913.00 | 1279699.46 | 26.8 |
|
County | GREGG |
Highway | IH0020 |
From | IH 20 THROUGH GREGG, SMITH, AND |
To | VAN ZANDT COUNTIES |
CSJ | 6431-18-001 |
Proj ID | RMC - 643118001 |
Work Type | MILL AND INLAY |
|
| 0.010 | 3321534.69 | | 1185201.80 | 35.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 02-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 210 |
Addl Days Granted | 0 |
Working Days Charged | 58 |
Percent Time Used | 27 |
Contractor(s) |
DREWERY CONSTRUCTION COMPANY, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6431-18-001 STRIPING TECHNOLOGY, L.P. (1.72) SURFACE PREPARATION TECHNOLOGIES, LLC (0.34)
|
Contract # | 11234028 |
| Totals | 3321534.69 | 1185201.80 | 1185201.80 | 35.6 |
|
County | SMITH |
Highway | US0069 |
From | VARIOUS LOCATIONS IN THE TYLER DISTRICT |
To | TYLER DISTRICT |
CSJ | 6431-60-001 |
Proj ID | MMC - 643160001 |
Work Type | HOT MIX |
|
| 0.010 | 2527200.00 | | 1918501.83 | 75.9 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-21-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 365 |
Working Days Charged | 314 |
Percent Time Used | 43 |
Contractor(s) |
TEXAS MATERIALS GROUP, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6431-60-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02234040 |
| Totals | 2527200.00 | 139794.46 | 1918501.83 | 75.9 |
|
County | CHEROKEE |
Highway | US0069 |
From | VARIOUS LOCATION IN CHEROKEE, ETC. |
To | TO INCLUDE SURROUNDING COUNTIES |
CSJ | 6431-88-001 |
Proj ID | MMC - 643188001 |
Work Type | HOT MIX |
|
| 0.010 | 3236840.00 | | 2481855.98 | 76.6 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 05-22-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 313 |
Percent Time Used | 85 |
Contractor(s) |
LONGVIEW ASPHALT, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6431-88-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02234041 |
| Totals | 3236840.00 | 39377.50 | 2481855.98 | 76.6 |
|
County | RUSK |
Highway | US0259 |
From | ANDERSON, HENDERSON, CHEROKEE, SMITH, |
To | RUSK, GREGG, VAN ZANDT & WOOD CO. |
CSJ | 6433-90-001 |
Proj ID | MMC - 643390001 |
Work Type | ROCK/RIPRAP |
|
| 0.010 | 756000.00 | | 423972.10 | 56.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 08-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 242 |
Percent Time Used | 66 |
Contractor(s) |
TOUCHSTONE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6433-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03234034 |
| Totals | 756000.00 | 91921.20 | 423972.10 | 56.0 |
|
County | HENDERSON |
Highway | SH0019 |
From | VARIOUS ROADWAYS IN HENDERSON |
To | AND ANDERSON COUNTIES |
CSJ | 6435-20-001 |
Proj ID | RMC - 643520001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 674323.00 | | 89120.00 | 13.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 09-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 730 |
Addl Days Granted | 0 |
Working Days Charged | 175 |
Percent Time Used | 23 |
Contractor(s) |
JCW CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6435-20-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 06234038 |
| Totals | 674323.00 | 21086.00 | 89120.00 | 13.2 |
|