Monthly State Let Construction Report For Atlanta District As Of Mar 13, 2024 Page 1 Of 2

Last Update: Wednesday, March 13, 2024
FTP Icon
page 1 | page 2

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyBOWIE ETC
HighwayUS 67 ETC
From0.5 MI E OF SH 8
To0.5 MI W OF SH 8
CSJ0010-12-075
Proj IDSTP 2023(375)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
11.0001397827.97616136.3444.0
Work Order03-23-23
Work Began12-04-23
Work Completed
Time Computed07-20-23
Contract Working Days172
Addl Days Granted0
Working Days Charged97
Percent Time Used56
Contractor(s)
WG ENGINEERING & CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0010-12-075
GOMEZ PROPERTY SOLUTIONS LLC (3.54)
RANSOM DRILLING SERVICES, LLC (2.87)
MEDELLIN HDD LLC (7.50)
Contract #01233222
Totals1397827.97140026.06616136.3444.0

CountyBOWIE ETC
HighwayFM 991 ETC
FromUS 67 W
ToUS 67 E
CSJ0010-19-014
Proj IDF 2024(073)
Work TypeSEAL COAT
 
201.63211823241.45774586.616.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-11-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days88
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
CDM HOLDINGS
SUBCONTRACTOR(S) FOR CCSJ: 0010-19-014
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10233008
Totals11823241.45442222.85774586.616.5

CountyBOWIE
HighwaySH 8
FromAT SULPHUR RIVER & SULPHUR RIV REL
To.
CSJ0062-01-035
Proj IDBR 2019(689)
Work TypeBRIDGE REPLACEMENT
 
1.55135121366.7232790451.8193.3
CountyCASS
HighwaySH 8
FromAT SULPHUR RIVER & SULPHUR RIV REL
To.
CSJ0062-02-024
Proj IDBR 2019(690)
Work TypeBRIDGE REPLACEMENT
 
0.3602612244.521507845.4257.7
Work Order05-02-19
Work Began05-13-19
Work Completed
Time Computed05-13-19
Contract Working Days1,215
Addl Days Granted11
Working Days Charged815
Percent Time Used66
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0062-01-035
BOWMAN ENGINEERING & CONSULTING, INC. (4.17)
ISAACS CONSTRUCTION SERVICES LLC (0.09)
JB PINNACLE GROUP, LLC (2.55)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.60)
PANOLA SIGN & BARRICADE, INC. (0.16)
STRIPING TECHNOLOGY, L.P. (0.73)
TEXAS ALTERNATIVE GRASSER INCORPORATED (0.30)
MASSEY CONTRACTORS, LLC (0.13)
FARR FOUNDATION, INC. (1.00)
CAP RIVER LLC (0.36)
HERMANOS STEEL, LLC (0.03)
Contract #04193002
Totals37733611.2440643.9034298297.2390.8

CountyPANOLA
HighwayUS 59
FromUS 79 N
ToUS 59 S
CSJ0063-04-068
Proj IDSTP 2024(670)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.073393564.140.000.0
CountyPANOLA
HighwayUS 79
FromUS 59 N
ToUS 79 S
CSJ0063-11-061
Proj IDSTP 2024(670)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.602437563.870.000.0
CountyPANOLA
HighwaySH 149
FromUS 79 S
To0.8 MI S OF SH 315
CSJ0063-11-062
Proj IDSTP 2024(670)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1.836274431.400.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days71
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
H. V. CAVER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0063-04-068
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02243029
Totals1105559.410.000.000.0

CountyPANOLA
HighwayUS 59
From1.4 MI. N. OF SHELBY C/L
ToSHELBY C/L
CSJ0063-05-040
Proj IDSTP 2022(448)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1.403480465.19599836.1299.9
CountyCASS
HighwayUS 59
FromSH 43N
To0.1 MI. N. OF SH 77/FM 249
CSJ0218-04-122
Proj IDSTP 2022(448)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.155299386.45213006.6971.1
CountyUPSHUR
HighwayUS 259
From0.9 MI. S. OF FM 450
To0.25 MI. N. OF FM 726
CSJ0392-02-101
Proj IDSTP 2022(448)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
3.346546014.55493579.2590.3
CountyHARRISON
HighwayIH 20
From0.2 MI. W. OF US 80
To0.1 MI. W. OF FM 134
CSJ0495-10-102
Proj IDSTP 2022(448)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
3.928808760.02735841.1590.9
Work Order05-10-22
Work Began08-07-23
Work Completed
Time Computed06-09-22
Contract Working Days149
Addl Days Granted0
Working Days Charged137
Percent Time Used91
Contractor(s)
GRATIOT CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0063-05-040
FOX CONTRACTING KY, INC. (21.46)
FC TRAFFIC CONTROL, INC. (1.98)
Contract #04223013
Totals2134626.2116963.682042263.2195.6

CountyPANOLA
HighwayUS 59
FromAT INTERSECTION OF FM 1794
To.
CSJ0063-10-015
Proj IDC 63-10-15
Work TypeINTERCHANGE (NEW OR RECONSTRUCTED)
 
1.45836905848.4511521950.4431.2
Work Order07-13-23
Work Began08-08-23
Work Completed
Time Computed08-08-23
Contract Working Days504
Addl Days Granted0
Working Days Charged123
Percent Time Used24
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0063-10-015
HODGES AND SON CONSTRUCTION COMPANY, INC. (0.46)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.39)
PANOLA SIGN & BARRICADE, INC. (0.15)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.34)
STRIPING TECHNOLOGY, L.P. (1.58)
TORO BRAVO CONSTRUCTION, LLC (0.33)
ISAACS CONSTRUCTION SERVICES LLC (0.59)
WEST TEXAS ROCK RESOURCES, LLC (0.01)
A&A TREE SERVICES (0.00)
HIGHWAY 1 LLC (0.39)
Contract #06233003
Totals36905848.451670639.3911521950.4431.2

CountyPANOLA
HighwaySH 149
From0.8 MI S OF SH 315
ToUS 59
CSJ0063-11-054
Proj IDF 2023(026)
Work TypeWIDEN NON-FREEWAY
 
1.62329546263.0715496852.4652.4
Work Order10-19-22
Work Began11-03-22
Work Completed
Time Computed11-03-22
Contract Working Days205
Addl Days Granted203
Working Days Charged229
Percent Time Used56
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0063-11-054
CAP RIVER LLC (0.68)
FARR FOUNDATION, INC. (2.38)
ISAACS CONSTRUCTION SERVICES LLC (0.61)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.98)
PANOLA SIGN & BARRICADE, INC. (0.12)
SCOTT DERR PAINTING CO, LLC (0.03)
STRIPING TECHNOLOGY, L.P. (2.28)
INTERSTATE BARRICADES & MARKINGS, INC. (0.28)
A&A TREE SERVICES (0.00)
CARTHAGE DRILLING, INC. (0.03)
Contract #09223001
Totals29546263.07375714.1015496852.4652.4

CountyBOWIE
HighwayUS 259
From2.3 MI S OF FM 561
ToFM 561
CSJ0085-02-054
Proj IDC 85-2-54
Work TypeREHABILITATION OF EXISTING ROAD
 
2.3756010666.290.000.0
CountyBOWIE
HighwayUS 259
FromFM 561
To0.03 MI S OF CR 4243
CSJ0085-02-055
Proj IDC 85-2-55
Work TypeREHABILITATION OF EXISTING ROAD
 
2.4345477266.910.000.0
CountyBOWIE
HighwayUS 259
FromWARD CREEK
To0.1 MI S OF CR 4243
CSJ0085-02-056
Proj IDC 85-2-56
Work TypeREHABILITATION OF EXISTING ROAD
 
3.4219488012.370.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-06-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days276
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0085-02-054
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02243005
Totals20975945.570.000.000.0

CountyBOWIE ETC
HighwayFM 2735 ETC
From8.3 MI. N. OF US 82
ToUS 82
CSJ0085-03-017
Proj IDSTP 2021(299)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
58.3451493307.901339079.1389.6
Work Order07-28-21
Work Began11-16-21
Work Completed
Time Computed08-30-21
Contract Working Days285
Addl Days Granted68
Working Days Charged282
Percent Time Used79
Contractor(s)
HX FARMS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0085-03-017
FLEX SUPPLY, LLC (1.67)
H. V. CAVER, INC. (1.33)
CLEANVAC ENVIRONMENTAL LLC (2.00)
Contract #06213026
Totals1493307.902000.001339079.1389.6

CountyUPSHUR
HighwayUS 80
FromWOOD C/L
To0.3 MI E OF SH 155N
CSJ0096-03-075
Proj IDF 2023(088)
Work TypeREHABILITATION OF EXISTING ROAD
 
2.9266277174.343786684.2460.3
Work Order10-11-22
Work Began03-23-23
Work Completed
Time Computed03-10-23
Contract Working Days162
Addl Days Granted0
Working Days Charged126
Percent Time Used77
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0096-03-075
COLD CREEK CONSTRUCTION, LTD (4.29)
ISAACS CONSTRUCTION SERVICES LLC (2.06)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.66)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.88)
PANOLA SIGN & BARRICADE, INC. (1.28)
R & G CONSTRUCTION, LLC (17.73)
REYNOLDS & KAY, LTD. (1.77)
STRIPING TECHNOLOGY, L.P. (2.59)
Contract #09223025
Totals6277174.34448179.013786684.2460.3

CountyHARRISON
HighwayUS 80
FromGREGG C/L
To0.1 MI. W. OF TOM BROWN PARKWAY
CSJ0096-07-054
Proj IDF 2B23(018)
Work TypeOVERLAY
 
6.7426333886.66541904.128.5
Work Order12-05-23
Work Began12-07-23
Work Completed
Time Computed12-07-23
Contract Working Days128
Addl Days Granted0
Working Days Charged34
Percent Time Used26
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0096-07-054
CAP RIVER LLC (1.82)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (4.61)
ISAACS CONSTRUCTION SERVICES LLC (0.11)
KENT TREE SERVICE LLC (4.19)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.21)
PANOLA SIGN & BARRICADE, INC. (0.30)
R & G CONSTRUCTION, LLC (4.03)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.47)
STRIPING TECHNOLOGY, L.P. (5.33)
REYNOLDS & KAY, LTD. (4.83)
Contract #08233011
Totals6333886.6686434.12541904.128.5

CountyCASS ETC
HighwayFM 248 ETC
FromSH 43
ToMARION C/L
CSJ0138-10-029
Proj IDSTP 2021(287)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
98.4602714170.793450904.4699.9
Work Order05-20-21
Work Began07-06-21
Work Completed
Time Computed06-21-21
Contract Working Days304
Addl Days Granted145
Working Days Charged455
Percent Time Used101
Contractor(s)
H. V. CAVER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0138-10-029
PANOLA SIGN & BARRICADE, INC. (1.19)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.90)
JM YANEZ CONSTRUCTION, INC. (14.01)
ISAACS CONSTRUCTION SERVICES LLC (1.21)
CLEANVAC ENVIRONMENTAL LLC (0.73)
Contract #04213005
Totals2714170.7992119.643450904.4699.9

CountyBOWIE
HighwayIH 369
FromIH 30
ToUS 59
CSJ0218-02-055
Proj IDF 2024(669)
Work TypeOVERLAY
 
3.52310246641.100.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days98
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0218-02-055
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02243215
Totals10246641.100.000.000.0

CountyCASS
HighwayUS 59
From0.1 MI S OF FM 2791
To0.1 MI S OF LOUISE STREET
CSJ0218-03-086
Proj IDC 218-3-86
Work TypeOVERLAY
 
0.5801923482.600.000.0
CountyCASS
HighwayUS 59
From0.1 MI S OF LOUISE STREET
To0.1 MI N OF FM 249
CSJ0218-04-117
Proj IDC 218-4-117
Work TypeOVERLAY
 
2.1037650358.230.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-07-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days93
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0218-03-086
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02243210
Totals9573840.830.000.000.0

CountyCASS
HighwayUS 59
From0.2 MI N OF SL 236 (SOUTHBOUND ONLY)
To0.5 MI S OF FM 3129
CSJ0218-03-094
Proj IDC 218-3-94
Work TypeREHABILITATION OF EXISTING ROAD
 
6.4007806580.010.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-02-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days74
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0218-03-094
BAHENA CONSTRUCTION CO.,INC. (0.29)
DUSTIN ALLEN, INC. (0.35)
INDUSTRIAL FABRICS, INC. (0.21)
O. TREVINO CONSTRUCTION, LLC (2.38)
PANOLA SIGN & BARRICADE, INC. (0.38)
STRIPING TECHNOLOGY, L.P. (3.47)
SURFACE PREPARATION TECHNOLOGIES, LLC (0.13)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.30)
TEXOP CONSTRUCTION (6.32)
WITHERS CONSTRUCTION, LLC (2.53)
Contract #01243210
Totals7806580.010.000.000.0

CountyTITUS
HighwayUS 271
FromAT DICKSON CREEK, BIG SLOUGH,
To.
CSJ0221-05-065
Proj IDBR 2020(451)
Work TypeBRIDGE REPLACEMENT
 
0.5868328468.536351747.2576.2
CountyTITUS
HighwayUS 271
FromAT WHITE OAK CREEK
To.
CSJ0221-05-086
Proj IDBR 2020(451)
Work TypeBRIDGE REPLACEMENT
 
0.4436685831.523783869.7856.5
CountyTITUS
HighwayUS 271
FromAT WHITE OAK CREEK_ RELIEF
To.
CSJ0221-05-087
Proj IDBR 2020(451)
Work TypeBRIDGE REPLACEMENT
 
0.6447213058.983460911.7447.9
Work Order12-16-21
Work Began01-03-22
Work Completed
Time Computed01-05-22
Contract Working Days602
Addl Days Granted12
Working Days Charged346
Percent Time Used56
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0221-05-065
HODGES AND SON CONSTRUCTION COMPANY, INC. (0.00)
ISAACS CONSTRUCTION SERVICES LLC (1.15)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.03)
PANOLA SIGN & BARRICADE, INC. (0.15)
STRIPING TECHNOLOGY, L.P. (0.74)
TORO BRAVO CONSTRUCTION, LLC (3.02)
FARR FOUNDATION, INC. (0.64)
TORO BRAVO CONSTRUCTION, LLC (0.02)
Contract #11213228
Totals22227359.03245418.5313596528.7761.1

CountyTITUS
HighwaySH 49
FromUS 271
ToBU 271
CSJ0248-01-082
Proj IDF 2024(645)
Work TypeOVERLAY
 
1.9172881429.500.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-02-24
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days52
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0248-01-082
STRIPING TECHNOLOGY, L.P. (2.60)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.85)
PROFESSIONAL TRAFFIC CONTROL LLC (0.23)
PANOLA SIGN & BARRICADE, INC. (0.57)
Contract #01243221
Totals2881429.500.000.000.0

CountyUPSHUR
HighwayUS 271
From5.9 MI. N. OF SH 155
To1.5 MI. N. OF SH 155
CSJ0248-04-072
Proj IDNH 2020(145)
Work TypeREHABILITATION OF EXISTING ROAD
 
4.23112013248.8711798323.7499.9
Work Order12-22-21
Work Began02-25-22
Work Completed
Time Computed01-21-22
Contract Working Days189
Addl Days Granted0
Working Days Charged363
Percent Time Used192
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0248-04-072
STRIPING TECHNOLOGY, L.P. (1.20)
R & G CONSTRUCTION, LLC (14.38)
SURFACE PREPARATION TECHNOLOGIES, LLC (0.07)
COLD CREEK CONSTRUCTION, LTD (0.83)
ISAACS CONSTRUCTION SERVICES LLC (0.23)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.60)
CF SOUTHWEST ENVIRONMENT SERVICES LLC (0.00)
PRIMATE CONSTRUCTION, LP (0.98)
PANOLA SIGN & BARRICADE, INC. (0.26)
A. L. HELMCAMP, INC. (0.25)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.90)
Contract #11213227
Totals12013248.87150058.4011798323.7499.9

CountyUPSHUR
HighwaySH 154
FromFM 726 S
ToUPSHUR C/L
CSJ0402-02-035
Proj IDSTP 2023(698)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
7.3341394643.361385352.3099.3
CountyHARRISON
HighwaySH 154
FromUPSHUR C/L
To4.43 MI E OF FM 2208
CSJ0402-03-042
Proj IDSTP 2023(698)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
13.1332097779.541615205.3576.9
Work Order06-14-23
Work Began07-17-23
Work Completed
Time Computed07-17-23
Contract Working Days197
Addl Days Granted0
Working Days Charged139
Percent Time Used70
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0402-02-035
WITHERS CONSTRUCTION, LLC (13.40)
PANOLA SIGN & BARRICADE, INC. (0.51)
J. H. ODEN CONTRACTING COMPANY (3.82)
Contract #05233215
Totals3492422.90117940.703000557.6585.9

CountyPANOLA
HighwaySH 315
From0.5 MI W OF FM 348
ToRUSK C/L
CSJ0462-03-048
Proj IDF 2B23(017)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.4932393806.97932562.3638.9
CountyPANOLA
HighwaySH 315
FromFM 1970
To0.5 MI W OF FM 348
CSJ0462-03-050
Proj IDSTP 2B23(019)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
6.1853576329.3562983.301.7
Work Order09-13-23
Work Began12-04-23
Work Completed
Time Computed10-13-23
Contract Working Days199
Addl Days Granted0
Working Days Charged79
Percent Time Used39
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0462-03-048
CAP RIVER LLC (0.28)
ISAACS CONSTRUCTION SERVICES LLC (0.22)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.94)
PRIMATE CONSTRUCTION, LP (0.59)
PANOLA SIGN & BARRICADE, INC. (0.69)
R & G CONSTRUCTION, LLC (7.84)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.40)
STRIPING TECHNOLOGY, L.P. (9.08)
Contract #08233012
Totals5970136.32350973.33995545.6616.6