Unilateral Change Orders
Do not use a unilateral
CO
for work that is outside the scope of the project or for dispute resolution. Work outside the limits, excluding end of project transition areas or added work outside the original intent of the project, should not be forced on a contractor through the use of a unilateral CO
. Should a unilateral CO
be needed coordinate with CST. The DE will approve and sign all unilateral COs
.