TxDOT Elastomeric Bridge Bearing Pad Fabrication Notification DMS-7365

Step 1 of 2

Manufacturer Information

1.Fabrication start date is defined as the date manufacturing operations begin. 


Manufacturer is required to notify MTD-Structural-Waco at least seven (7) calendar days prior to the start of fabrication. A revised TxDOT Fabrication
Notification Form is required if the projected fabrication start date changes. The seven (7) day requirement applies to the revised form as well.

Step 2 of 2

Project Information

Material Description

Bid Item Code(s) 

Quantity 

For TxDOT use only