Projected Fabrication Start Date1:
1. Fabrication start date is defined as the date cutting of materials begin.
Fabricator is required to notify MTD_StructuralSteel-Inspections prior to the start of fabrication in accordance with Item 441.3.1.2 Table 1. A revised TxDOT Fabrication Notification is required if the projected fabrication start date changes. The advance notification requirement applies to the revised form as well.
Projected Fabrication Completion Date2:
2. The projected fabrication completion date is the date in-plant fabrication is completed, which includes coating application.
Type of Coating:
Step 2 of 2
Material Description3
Bid Item Code(s)
Quantity
For TxDOT use only
3. Example: Griders, Tubs, Trusses, Beams, …etc.