Step 1 of 3
(For use ONLY with MTD Commercial Warehousing Program)
Step 2 of 3
1Â Preferred Inspection Date:Â
2Â Date Paperwork Sent Electronically:
1Â Allow 3 business days minimum after receiving paper work for scheduled inspection.
2Â All documentation must be verified for project compliance and initialed by qualified personnel prior to scanning and E-mailing to our address.
Type of Inspection:
Material Description 3
Batch/Lot/Heat #Â
QuantityÂ
UOMÂ
3Â Fabricator's long description examples: S3X5.7 Stub, T2/201 Retro Plate Left, etc.
For TxDOT Use Only:
Step 3 of 3
Material Category (select one)Â
Material CodeÂ
Bid Item Code(s)Â