2004 English Special Provisions for Bryan - District 17 (Statewide & Districtwide, Current)
|
SP752-008 |
PDF |
RTF |
Tree and Brush Removal - Adds a pay item for trimming individual trees by the each.
Districtwide Use.
|
SP752-002 |
PDF |
RTF |
Tree and Brush Removal - Stump removal.
Districtwide Use.
|
SP730-003 |
PDF |
RTF |
Roadside Mowing - Provides for pressure washing equipment to prevent the spread of branched broomrape.
(Change Memo: de-79-04). Districtwide Use.
|
SP528-001 |
PDF |
RTF |
Colored Textured Concrete and Landscape Pavers - Allow payment for multiple types of this item.
Districtwide Use.
|
SP427-003 |
PDF |
RTF |
Surface Finishes for Concrete - Adds ''of the type specified'' for Concrete Paint Finish and for Opaque Sealer Finish in the measurement article.
Districtwide Use.
|
SP192-008 |
PDF |
RTF |
Landscape Planting - Perform the maintenance work for a minimum of 365 calendar days at designated locations by following the work schedule and frequencies shown on the plans.
Districtwide Use.
|
SP7224-002 |
PDF |
RTF |
Repair Cable Barrier System - Provides for the repair of cable barrier systems.
Districtwide Use.
|