2004 English Special Provisions for Pharr - District 21 (All)


2004 English Special Provisions By District (All)
2004 English Special Provisions by Item (All)
Specification Information

SP672-004  PDF  RTF  Raised Pavement Markers - Measurement will be paid for at the unit price bid for Jiggle Bar Tile Reflectorized Pavement Marker Traffic Button or Plowable Reflectorized Pavement Marker Districtwide Use.
SP666-008  PDF  RTF  Reflectorized Pavement Markings - Acrylic or epoxy sealer, or Type II markings when used as a sealer for Type I markings, will be measured by the foot; by each word, symbol or shape by any other unit shown on the plans. Districtwide Use.
SP400-007  PDF  RTF  Excavation and Backfill for Structures - Unless otherwise shown on the plans, the sand backfill shall have 70-100% passing a No. 10 sieve. The plastic Index (PI) as determined by Test Method Tex-106-E shall not exceed 6. Districtwide Use.
SP400-001  PDF  RTF  Excavation and Backfill for Structures - Allow for payment of gravel bedding material and sand backfll, and to specifiy sand's and gravel's gradation requirements. Districtwide Use.
SP302-013  PDF  RTF  Aggregates for Surface Treatments - Modifies Article 302.2 Materials, Section A. Aggregate, Table 2. Districtwide Use.
SP302-003  PDF  RTF  Aggregates for Surface Treatments - Aggregate gradation requirements for grade 4 aggregate. Districtwide Use.
SP300-031  PDF  RTF  Asphalts, Oils, and Emulsions - This creates a description code for a speciality prime coat binder for EC-30. Districtwide Use.
SP247-041  PDF  RTF  Flexible Base - Adds ride quality with only one lift of Hot Mix ACP or a 1 or 2 course surface treatment for the final surface for quality control and provides recycled materials that have a maximum sulfate content of 3000 ppm when tested in accordance with Tex-145-E. SP 247---041 contains the requirements of 247---033 and 247---026 and may be used in lieu of 247---033. Districtwide Use.
SP247-026  PDF  RTF  Flexible Base - Adds ride quality with only one lift of Hot Mix ACP or a 1 or 2 course surface treatment for the final surface for quality control and provides recycled materials that have a maximum sulfate content of 3000 ppm when tested in accordance with Tex-145-E. SP 247---026 contains the requirements of 247---020 and 247---016 and may be used in lieu of 247---020. Replaces SP247-016 . Districtwide Use.
SP247-016  PDF  RTF  Flexible Base - Adds Ride Quality to flexible base with only one lift of Hot Mix ACP or a 1 or 2 course surface treatment for the final surface for quality control. Replaced by SP247-026 . Districtwide Use.
SP247-013  PDF  RTF  Flexible Base - Adds Ride Quality (SP 247---011, statewide) to SP 247---007 (districtwide, which allows measurement for Flexible Base (Roadway Delivery) to include any cubic yard method). Replaces SP247-007 .Replaced by SP247-029 . Districtwide Use.
SP247-007  PDF  RTF  Flexible Base - Changes Flexible Base (Roadway Delivery) measurement to by the ton or any cubic yard method. Changes Flexible Base (Roadway Delivery) payment for cubic yard measurement to be In Vehicle, In Stockpile, or In Final Position. Replaces SP247-003 .Replaced by SP247-013 . (Change Memo: de-01-97). Districtwide Use.
SP247-003  PDF  RTF  Flexible Base - Changes measurement and payment methods. Replaced by SP247-007 . Districtwide Use.
SP164-006  PDF  RTF  Seeding for Erosion Control - Adds native grass species that are well adapted for arid South Texas. Includes the requirements of required SP 164---002. Districtwide Use.
SP000-166  PDF  RTF  IMPORTANT NOTICE TO CONTRACTORS - For project 0039-08-087 in Cameron County. Right Of Way Acquisitions One-Time Use.

2004 English Special Provisions By District (All)
2004 English Special Provisions by Item (All)
Specification Information