Search Results
2004 | |||
Special Provisions | |||
SP006-030 | RTF | Control of Materials - Modifies Article 6.9, Recycled Materials that conflicted with DMS-11000. Includes the requirements of 006---029 which informs the Contractor that TxDOT will abate lead or asbestos separately from the prime contract. Required on all projects beginning with the May 2007 letting except when 006---031 is used. Replaces SP006-029 . (Change Memo: de-02-07). Statewide Use. | |
Search |
Specification Information |