Search Results
2004 | |||
Special Provisions | |||
SP006-028 | RTF | Control of Materials - Modifies Article 6.10 thus requiring the Contractor to remove the hazardous materials. This SP will also work for lead abatement or removal contracts. Should only be used for the specialty contracts to remove or abate asbestos. Do not include in our general construction and maintenance contracts. Replaced by SP006-031 . (Change Memo: de-50-06). Statewide Use. | |
Search |
Specification Information |