Search Results
2004 | |||
Special Provisions | |||
SP361-001 | RTF | Full-Depth Repair of Concrete Pavement - Adds appropriate references, allows more hot-mix or plastic bond breaker and allows the Engineer to waive temperature limits, if additional curing is performed. Required on all projects with Item 361 beginning with the May 2006 letting. Replaced by SP361-014 . (Change Memo: de-05-06). Statewide Use. | |
Search |
Specification Information |