El Paso District east area project, maintenance closures
Skip to main content

El Paso District east area project, maintenance closures

Purple Heart Loop 375 Widening

Saturday, February 03 through Friday, March 03

Daily, from 9:00 a.m. until 3:30 p.m.

  • Purple Heart Highway (Loop 375) north and southbound left inside lane closure between Montana Avenue and Spur 601

Crews will be removing demo and hauling material.

Montana Frontage Road Project

Monday, February 7 through Saturday, March 01

Daily, from 9:00 a.m. until 5:00 p.m.

  • Montana Avenue (US62180) eastbound frontage road left lane closure between Dominican Street to Leticia Street

Crews will be hauling dirt from jobsite.

Wednesday, February 14 to Saturday, February 24

Nightly, from 9:00 p.m. until 5:00 a.m.

  • George Dieter Drive Intersection full lane closure (north and southbound and east and westbound) and turnaround (east to westbound and west to eastbound) between Wooster Lane to Lee Boulevard

Crews will be moving concrete barrier.

Thursday, February 15 to Thursday, February 29

Staring at 9:00 a.m. continuous closure

  • Montana Avenue (US62/180) and Alba Lane north and southbound complete closure of intersection

Crews will be installing rebar and concrete paving.

Thursday, February 22 to Saturday, March 02

Nightly, from 9:00 a.m. until 5:00 p.m.

  • Montana Avenue (US62/180) George Dieter Intersection turnarounds will be closed (east to westbound and west to eastbound)

Crews will be working on curbs.

Friday, February 23

Overnight, from 9:00 a.m. until 5:00 p.m.

  • Company E Highway (Loop 375) northbound Montana Entrance Ramp will be closed.
  • Southbound to northbound turnaround will be closed.

Crews will be working on concrete paving.

Monday, February 26 and Tuesday, February 27

Nightly, from 9:00 p.m. until 5:00 a.m.

  • Montana Avenue (US62180) eastbound frontage road full closure between Lee Trevino Drive to Wooster.

Crews will be doing concrete paving.

Tuesday, February 27 to Thursday, February 29

Nightly, from 9:00 p.m. until 5:00 a.m.

  • Montana Avenue (US62180) eastbound frontage road full closure between Yarbrough Drive to Lee Trevino Drive.

Crews will be doing concrete paving.

Horizon (FM1281)/Darrington Reconstruction Project

Monday, February 26, through Friday, March 01

Daily 9:00 a.m. until 7:00 p.m.

  • Town Center Road at Darrington Road will be reduced to one lane traffic with flaggers.

Crews will be placing storm drains.

Paved Shoulders Project

Monday, February 27 through Friday, March 01

Daily from 6:00 am to 6:00 pm

  • Ascension Street northbound right lane closure between Kentwood Avenue and Horizon Boulevard

Crews will be working paving operations.

Monday, February 27 through Friday, March 01

Daily from 6:00 am to 6:00 pm

  • Alameda Avenue (SH20) east and westbound right shoulder closures between Acala and Spur 148 w/Pilot Car
  • Alameda Avenue (SH20) east and westbound right shoulder closures between Acala and Spur 148 w/Pilot Car

Crews will be working on installation of concrete rail Canal Street and installation of MBGF at Alamo Arroyo.

Loop 375 Widening Project

Sunday February 25, through Thursday February 29

Nightly 9:00 p.m. until 5:00 a.m.

  • Americas Highway (Loop 375) south and northbound main lane closure between North Loop Overpass and Zaragoza (POE) Overpass.
  • Zaragoza, Pan American and South Americas Truck (P.O.E) Underpass alternating complete closures.

Crews will be working on installing bridge structures, bridge deck pour and concrete pave.

Monday, February 26, through Saturday, March 2

Daily 9:00 a.m. until 4:00 p.m.

  • Americas Highway (Loop 375) south and northbound alternating left lane closure between Pan American Overpass and Zaragoza Overpass.
  • Americas Avenue (frontage road) Northbound Ivey Rd. at North Loop Rd. right lane.
  • Americas Avenue (frontage road) Northbound Pan American Entrance Ramp.

Crews will be working on installing bridge structures, sidewalk, and truck access.

Continuous from 5:00 a.m. Tuesday, February 27 through 5:00 a.m. Thursday, February 29.

  • Americas Highway (Loop 375) northbound left lane closure from Zaragoza Rd. Overpass (P.O.E.) to

South Americas Rd. Overpass (P.O.E.).

Closure will allow bridge deck to cure.

Continuous closures until further notice:

  • Loop 375 southbound to northbound truck turnaround at S. Americas will be closed.

Crews will be widening LP 375 main lane bridge structures.

IH-10 Underpass/FM793 Project

Thursday, February 29

Daily from 6:00 am to 6:00 pm

  • IH-10 east and westbound full lane closure at Fabens Bridge (FM793) underpass

Crews will be working bridge deck pours.

Continuous closures until further notice

  • I-10 east and westbound shoulder closures at Fabens (FM793) Underpass
  • Fabens Bridge (FM793)
  • I-10 east and westbound alternating lane closures at Fabens (FM793) Underpass

Crews will be working on bridge replacement.

Continuous closures

ADA Improvements Project

Friday, August 25 until further notice

Daily, from 9:00 a.m. until 5:00 p.m.

  • Alameda Avenue (SH 20) east and westbound alternating lane closures from Americas Highway (Loop 375) to Horizon Boulevard (FM 1281)

Crews will be removing sidewalks and ramps for ADA improvements.

Horizon (FM1281)/Darrington Reconstruction Project

Monday, January 22

Continuous closures until further notice

  • Horizon Boulevard (FM1281) westbound shoulder closures from Torrey Pines to Desert Mesa Drive
  • Horizon Boulevard (FM1281) westbound lanes from Torrey Pines to Desert Mesa Drive hike/bike trail will be closed indefinitely.

Crews will be placing clearing landscape, reconstructing driveways, installing storm sewer lines, and begin excavation for ponding areas.

IH-10 Underpass/FM793 Project

Continuous closures until further notice

  • I-10 east and westbound shoulder closures at Fabens (FM793) Underpass
  • Fabens Bridge (FM793)
  • I-10 east and westbound alternating lane closures at Fabens (FM793) Underpass

Crews will be working on bridge replacement.

Purple Heart Loop 375 Widening

Continuous until further notice

  • Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601

Crews will be constructing north and southbound frontage road.

Median Concrete Barrier Project

Continuous until further notice

  • Montana Avenue (US 62/180) east and westbound complete left lane closure between RM 124 and RM 126 (Guadalupe Peak)
  • Traffic will be reduced to one lane in work areas.

Closure is necessary for installation of median concrete barrier.

RM 652 Full Depth Rehabilitation Project

Continuous until further notice

  • RM 652 east and westbound alternating lane closure 8.36 miles east of FM 3541 to Reeves County Line
  • Continuous two-way traffic, one-lane work zone requiring traffic to be alternating onto one lane and controlled by Temporary Traffic Signals with a 13-foot lane width restriction.

Closure is necessary for the construction of new roadway consisting of full depth rehabilitation.

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

Media contact
Lauren Macias-Cervantes
February 22, 2024