|
Title |
Format |
|
PDF |
|
Regulation Outlining Memorandum of Understanding between TxDOT and the
Texas Commission on Environmental Quality |
 |
|
Emergency Contacts List |
 |
|
U.S. Army Corps of Engineers (USACE)
Southwestern Division Guidelines for Requesting Use of Emergency Permit
Procedures on Section 404 and 10 Permit Actions – July 17, 2002, Memo from Col. Robert Crear
and March 21, 2007 Memo from Dianna Noble |
 |
|
Storm Water Field Inspector's Guide, June 2004 |
 |
|
Memorandum of Agreement Between TxDOT and the Texas Parks and Wildlife
Department for Finalization of 1998 MOU Concerning Habitat Descriptions
and Mitigation |
 |
|
U.S. Army Corps of Engineers 404 Permit Pre-Application Process, August 2002 |
 |
|
Memorandum of Understanding between TxDOT and the Texas General Land
Office, January 2003 |
 |
|
Texas Transportation Institute Report #1837: Design Methods, Selection,
and Cost Effectiveness of Stormwater Quality Structures |
 |
|
Memorandum of Understanding between
TxDOT and the Texas Commission on Environmental Quality |
 |
|
Texas 2004 Clean Water Act Section 303(d) List |
 |
Texas
Commission on Environmental Quality
Section 401 Requirements |
|
Title |
Format |
|
PDF |
|
Tier I (Small Projects) Checklist for Section 404 Individual Permits |
 |
|
State Water Quality Certification of Section 404 Permits /Tier II 401
Certification Questionnaire /Analysis Checklist |
 |
|
Memorandum of Agreement Between the U.S. Army Corps of Engineers and the
Texas Commission on Environmental Quality (TCEQ) on Section 401 Certification
Procedures |
 |
|
Environmental Affairs Division memo to Districts regarding Section 401
Best Management Practices (BMPs), May 2004 |
 |
|
TCEQ letter to U.S. Army Corps of Engineers Regarding Nationwide
Permits, April 2002 |
 |
|
TCEQ 401 Water Quality Certification Conditions for Nationwide Permits,
Including Description of BMPs and Reference to BMP Requirements |
 |
Storm Water
Management Guidelines for
Construction Activities |
|
Title |
Format |
|
PDF |
Word |
|
Table of Contents and Section 1.0 Introduction to Storm Water Management |
 |
|
|
Section 2.0 Storm Water Pollution Prevention Plans (SW3Ps) |
 |
|
|
Section 3.0 Design of Control Measures Best Management Practices (BMPs) |
 |
|
|
Section 4.0 Erosion Control BMPs |
 |
|
|
Section 5.0 Sediment Control BMPs |
 |
|
|
Section 6.0 Other Controls |
 |
|
|
Section 7.0 Maintenance and Inspection of BMPs |
 |
|
|
Section 8.0 Preconstruction Conference Requirements |
 |
|
|
Section 9.0 Completion of Project and Release of Contractor |
 |
|
|
Section 10.0 TPDES Construction General Permit |
 |
|
|
Appendix A:
TCEQ TPDES Construction General Permit |
 |
|
|
Appendix B:
Construction Site Notice |
 |
 |
|
Appendix B:
Construction Site Notice (Waiver) |
 |
 |
|
Appendix B:
Waiver Application for Small Sites |
 |
 |
|
Appendix B:
Notice of Intent (NOI) Form |
 |
 |
|
Appendix B:
Notice of Termination (NOT) |
 |
 |
|
Appendix B:
Example Notice of Intent |
 |
|
|
Appendix B:
TxDOT Fee Payment Form |
|
 |
|
Appendix D:
Index to Statewide Specifications and Drawings |
 |
|
|
Appendix E:
TxDOT SW3P Inspection Form |
 |
|
Municipal Separate Storm Sewer
System Permits |
|
Title |
Format |
|
PDF |
Other |
|
What is an MS4? |
|
 |
|
Proposed Phase II MS4 Permit |
 |
|
|
Fact Sheet for Proposed Phase II MS4 Permit |
 |
|
|
Draft Storm Water Management Program |
|
 |