For more information please refer to the Loop 375 Transmountain Rd. project page.
| Where: | Canutillo High School Cafeteria 6675 South Desert Blvd. El Paso, TX |
When: |
Tuesday, Mar. 22, 2011 6 p.m. - Open House 7:00 p.m. - Public Hearing |
| Purpose: |
The purpose of the hearing is to provide information about the
proposed improvements to Loop 375 from I-10 to east of the Franklin
Mountains State Park entrance, a distance that includes
approximately 3.6 miles of mainlanes and approximately 2.10 miles of
frontage roads (from Northwestern Drive to Paseo Del Norte Drive). |
||
| Description: |
The proposed improvements will consist of expanding the
current two-lane undivided roadway to a four-lane divided
roadway with two-lane frontage roads. The improvements also
include grade separated intersections at Northwestern Drive,
Resler Drive, Plexxar Drive and Paseo del Norte Drive as well as
two direct connectors from Loop 375 west to I-10 east and from
I-10 west to Loop 375 east. As part of this project shared
hike-and-bike trail will be constructed separate from the
roadways, near the Loop 375 right-of-way line, between the
intersections of Northwestern Drive and Paseo del Norte Drive.
Access to the LP 375 main lanes and frontage roads will be by
means of entrance and exit ramps at various locations between
intersections. The right-of-way (ROW) footprint and geometric
design provides for expansion to six main lanes from
Northwestern Drive to east of Paseo del Norte Drive. |
||