Need and purpose

The project is needed because I-35 between Loop 121 in Belton to Loop 363/US 190/SH 36 in Temple:

  • is inadequate to meet current and future traffic volumes, resulting in congestion, reduced mobility and an unacceptable Level of Service on this stretch of highway;
  • has safety and operation issues due to ramp and intersection configurations;
  • provides important connectivity with facilities throughout the area, including the future Temple Outer Loop;
  • is part of the broader expansion of I-14 and the freeway-to-freeway connections do not meet current criteria and standards for an interstate facility.

The purpose of the proposed project is to enhance safety and operations, reduce traffic congestion, improve roadway connectivity in the I-35 corridor and accommodate the future I-14 extension.