SH 289 from FM 120 to End of State Maintenance (Elks Blvd.)
Skip to main content

SH 289 from FM 120 to End of State Maintenance (Elks Blvd.)

In-person public meeting with virtual option

In-person: Thursday, Nov. 9, 2023, from 5 to 7 p.m. CT

Virtual: Thursday, Nov. 9, 2023, beginning at 5 p.m. CT

Virtual meeting presentation
Public comment deadline All comments must be received on or before Friday, Dec. 1, 2023.
Virtual details The virtual meeting can be viewed on this webpage beginning Thursday Nov. 9, 2023, by 5 p.m. CT.

The virtual public meeting will consist of a pre-recorded video presentation that includes both audio and video components, along with other exhibits. The virtual public meeting is not a live event and the materials can be viewed at your convenience. If you do not have internet access, you may call 903-737-9282 between the hours of 8 a.m. and 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process.
In-person details

The same information will be available at both the virtual and in-person meeting, including a pre-recorded video presentation with audio and visual components.

Nov. 9, 2023
5 to 7 p.m.
Georgetown Baptist Church Gym
207 Georgetown Rd.
Pottsboro, Texas, 75076

The in-person public meeting will begin at 5 p.m. and will be open house format where the public may come and go at their convenience. Staff will be available to answer questions and receive written comments.

Purpose The Texas Department of Transportation Paris District is proposing to improve State Highway (SH) 289 from Farm-to-Market (FM) 120 to End of State Maintenance (Elks Boulevard) in Grayson County, Texas. This notice advises the public that TxDOT will be conducting an in-person public meeting with a virtual option.
Description The proposed improvements to SH 289 include widening SH 289 from FM 120 to End of State Maintenance (Elks Boulevard) from a two-lane highway to a five-lane highway with two lanes in each direction and a continuous two-way left turn lane for approximately 7.01 miles. The proposed project is not currently funded for construction.
Accessibility The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the TxDOT Project Manager, at 903-737-9282, no later than 4 p.m. CT, Monday, Nov. 6, 2023. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.
Meeting materials
How to make a comment

Submit comments via any of the following ways:

  • Email as shown in the notice
  • By mail:
    Paris District Office
    1365 North Main Street
    Paris, Texas, 75460

All comments must be received on or before Friday, Dec. 1, 2023. Responses to comments received will be available online on this webpage once they have been prepared.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: July 7, 2023