I-20 from east of FM 1936 to east of JBS Parkway
Skip to main content

I-20 from east of FM 1936 to east of JBS Parkway

Notice and opportunity to comment

Public comment deadline All comments must be received on or before Dec. 21, 2022.
Purpose The Texas Department of Transportation (TxDOT) is proposing to reconstruct and widen Interstate (I)-20 from east of Farm-to-Market 1936 to east of John Ben Shepperd Parkway in Ector County. This notice is affording an opportunity to comment as part of the environmental review process for this project.
Description

Improvements would include adding main lanes, constructing new interchanges, reconfiguring existing interchanges and ramps, intersection improvements, and converting frontage roads from two-way operation to one-way operation. The proposed project would require approximately 5.19 acres of new right of way (ROW). The total length of the proposed project is approximately 10.4 miles.

Although additional ROW would be required, no residential or non-residential structures are anticipated to be displaced at this time. Information concerning services and benefits available to affected property owners and information about the tentative schedule for ROW acquisition and construction can be obtained from the TxDOT Odessa District office by calling 432-498-4645.

If you have any general questions or concerns regarding the proposed project, please contact the Advanced Planning Engineer at 432-498-4645 or by email as shown in the notice.

Accessibility The project materials are written in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to review the project materials or submit information, please call the TxDOT Public Information Officer at 512-832-7027 no later than 4 p.m. central time, at least three business days before the date on which you would like to review the project materials or submit information. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Additional information
How to make a comment

Written comments may be submitted by:

  • Mail:
    TxDOT Odessa District Office
    Attn: Advanced Planning Engineer
    3901 East Highway 80
    Odessa, TX 79761
  • Email: as shown in the notice

All comments must be received on or before December 21, 2022.

Memorandum of understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: Dec. 1, 2022