Loop 338 from E. Yukon Road to US 385 N.
Skip to main content

Loop 338 from E Yukon Road to US 385 N

Thursday, July 27, 2023, at 5 p.m. CT

State Loop 338 Virtual Public Meeting
Public comment deadline Comments must be received or postmarked by Friday, Aug. 11, 2023 to be part of the official public meeting record.
Virtual details The virtual public meeting presentation and materials will be posted on this page at the date and time listed above.
Description

The Texas Department of Transportation (TxDOT) Odessa District is proposing to widen Loop 338 from E. Yukon Road to US 385 N. in Ector County, Texas.

TxDOT is proposing to widen Loop 338 within the project limits from a four-lane divided highway to a four-lane freeway with frontage roads in each direction, for a distance of approximately five miles. In addition, a 10-foot shared-use path would be constructed to accommodate both bicyclists and pedestrians located on the outside of the frontage roads. The project would also consist of constructing overpasses at Grandview Avenue, 87th Street, and 100th Street, along with entrance and exit ramps, and auxiliary lanes.

Purpose The purpose of the virtual public meeting is for participants to view materials about the proposed improvements, watch a pre-recorded presentation, and provide input.
Accessibility The virtual public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting, please contact Elizabeth Story, Project Consultant, at (210) 864-0049 no later than 4 p.m. CT, Monday, July 24, 2023. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting Materials
How to make a comment

Written comments from the public regarding the proposed project are requested.

  • Mail: Poznecki-Camarillo
    c/o Loop 338 Project Team
    5835 Callaghan Rd., Ste. 200,
    San Antonio, TX 78228
  • Email: As shown in the notice
  • Online: Submit your comment online

Comments must be received or postmarked by Friday, Aug. 11, 2023 to be part of the official public meeting record.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

UPDATED: July 27, 2023