I-635/I-35E Interchange
Skip to main content

I-635/I-35E Interchange

Virtual public meeting with in-person option

Virtual: Thursday, Nov. 2, 2023, by 5:30 p.m. through Friday, Nov. 17, 2023, at 11:59 p.m.

In-person: Thursday, Nov. 2, 2023, from 5:30 - 7:30 p.m.

Public comment deadline All comments must be received before Friday, Nov. 17, 2023.
Virtual details

The virtual public meeting will be posted on the Keep It Moving Dallas webpage from Thursday, Nov. 2, 2023 at 5:30 p.m. through Friday, Nov. 17, 2023 at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

If you do not have internet access, you may call 214-320-6628 between the hours of 8 a.m. and 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process. Please note the materials will not be available until Thursday, Nov. 2, 2023, at 5:30 p.m.

In-person details

Thursday, Nov. 2, 2023
5:30 p.m. – 7:30 p.m.
Vivian Field Middle School Cafeteria
13551 Dennis Lane
Farmers Branch, TX 75234

The meeting will be an open house format where the public may come and go at their convenience.

Purpose
The Texas Department of Transportation (TxDOT) is proposing improvements to the I-635/I-35E interchange along I-635 from Luna Road to State Loop (SL) 354/Denton Drive and along I-35E & I-35E Express from Royal Lane to Valley View Lane in Dallas County, Texas.
Description

The proposed project improvements include the construction of four two-lane managed direct connectors within the existing I-635/I-35E interchange. The direct connectors facilitate access between I-635 and I-35E for the northbound to eastbound, southbound to eastbound, westbound to southbound, westbound to northbound movements. In addition, managed lanes (two lanes in each direction) would be constructed along I-635 from Luna Road to near Denton Drive. The added managed lane direct connectors at the I-635/I-35E interchange would be in addition to the eight existing direct connectors that will remain in place.

Although additional right of way would be required, no residential or non-residential displacements are anticipated at this time. Information concerning services and benefits available to affected property owners and information about the tentative schedule for right-of-way acquisition and construction can be obtained from the TxDOT district office by calling 214-320-6675.

The proposed project would involve construction in wetlands and an action in a floodplain.

Any environmental documentation or studies, any maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at TxDOT Dallas District Office, 4777 East U.S. Highway 80, Mesquite, TX 75150. Project materials are also available online at the project website. These materials will also be available in hard copy form for review at the in-person option.

Accessibility The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the Public Information Office at 214-320-4480, TxDOT Dallas District, no later than 4 p.m., Friday, Oct. 27, 2023. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.
Meeting materials
How to make a comment

Comments from the public regarding the proposed project are requested and may be submitted by:

  • Mail:
    TxDOT Dallas District Office
    Attn: Nelson Underwood P.E.
    4777 East US Highway 80
    Mesquite, TX 75150
  • Email: as shown in the public meeting notice
  • Verbal comments: by calling 281-768-3560.

All comments must be received before or postmarked by Friday, Nov. 17, 2023. Responses to comments received will be available online at the project website once they have been prepared.

If you have any general questions or concerns regarding the proposed project, virtual meeting or in-person option, please contact the project manager by phone at 214-320-6628 or email as shown in the notice.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: Oct. 16, 2023