FM 455 Feasibility Study from Dallas Parkway to Shady Brook Lane
Skip to main content

FM 455 Feasibility Study from Dallas Parkway to Shady Brook Lane

Virtual public meeting with in-person option

Virtual: Tuesday, June 20, 2023, 5:30 p.m. through Wednesday, July 5, 2023, at 11:59 p.m.

In-person: Tuesday, June 20, 2023, 5:30 - 7:30 p.m.

Public comment deadline

Comments must be received on or before Wednesday, July 5, 2023, to be part of the public meeting record.

Virtual details

The virtual public meeting will be posted on Tuesday, June 20, 2023, at 5:30 p.m. through Wednesday, July 5, 2023 at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person meeting option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting.

In-person details Tuesday, June 20, 2023
 5:30 - 7:30 p.m.
Two 29 on the Square
229 W. Pecan Street
Celina, TX 75009
(Open house format)
Purpose

TxDOT is conducting a feasibility study for improvements to FM 455 from Dallas Parkway to Shady Brook Lane in Collin County, Texas.

Description

The purpose of the feasibility study is to analyze potential roadway options to improve FM 455, including improving an existing alignment or developing new alignments. The proposed study could potentially result in projects that require additional right of way and include construction in wetlands and an action in a floodplain. The study area is within the City of Celina and ends just west of the City of Weston. 

Accessibility

The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the TxDOT Public Information Office, at (214) 320-4480 no later than 4 p.m., Tuesday, June 13, 2023. Advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.

Meeting materials
How to make a comment Written comments from the public regarding the proposed project are requested. Comments can be mailed to: TxDOT Dallas District Office, c/o Stephen Endres, P.E., RE: FM 455 Feasibility Study, 4777 E. U.S. Highway 80, Mesquite, TX 75150 or by email as listed in the notice. Verbal comments may be submitted by leaving a voicemail at (469) 920-2505. All comments must be received on or before Wednesday, July 5, 2023. 
Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: June 5, 2023