Transportation Study: SH 332

The scope of this study is a 5 mile span of State Highway (SH) 332 from SH 288 to Business Route (BU) 288.

Current Conditions

The existing roadway has 4 lanes.

Proposed Improvements

  • Widening the current road to include frontage roads.
  • Constructing 5 new grade-separated intersections.

Partners

This study is a partnership between TxDOT and the Federal Highway Administration.
 

Contact Us

Sarah Wyckoff
TxDOT Houston District
PO Box 1386
Houston, TX 77251-1386
Phone: (713) 802-5262
E-mail