Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost effective, while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
| Location | Project | Description |
| El Paso | Comprehensive Mobility Plan | An overall mobility strategy affecting El Paso and the surrounding area. |
| El Paso | Northeast Parkway | A potential 21-mile highway connecting Loop 375 to I-10 in Anthony, New Mexico. |
| El Paso | SPUR 601 | A proposed 7.4 mile road connecting US 54 and Loop 375. |
| El Paso | US 54 | The proposed widening of US 54 from Yandell Drive to Hondo Pass Drive. |