TxDOT is developing a project in Travis County to reconstruct the portion of State Highway (SH) 71 between Riverside Drive and SH 130 into a six-lane tolled freeway with three lanes in each direction.
Six lanes of non-tolled frontage roads (three lanes in each direction) are
also planned.
Grade-separated intersections would be located at Riverside Drive, US 183,
Spirit of Texas, Presidential Boulevard, Farm-to-Market (FM) 973 and SH 130.
The project is dedicated to reducing congestion, enhancing safety, expanding economic opportunity, improving air quality and increasing the value of our roadways.
Contact Us
Austin District Central Design Office
7901 N. I-35
Austin, TX 78753
Phone: (512) 832-7060
E-mail