|
Q: |
Will the project have toll booths? |
|
A: |
No.
With an electronic toll tag, tolls are deducted
automatically from your prepaid toll account (TxTag, Tolltag
or EZ TAG) when you use the road.
|
|
|
Q: |
How do I get a TxTag? |
|
|
|
Q: |
Where do I get on the new toll road? |
|
A: |
SH 121 will be accessible from the following roadways, in
order from north to south:
- Interstate 30
- Montgomery Street
- Future Stonegate Boulevard/Future Edwards Ranch Road
- Future Arborlawn Drive
- State Highway 183
- Interstate 20
- Overton Ridge Boulevard
- Oakmont Boulevard
- Dirks Road/Altamesa Boulevard
- Sycamore School Road
- Future McPherson Road
- FM 1187
- County Road 920
- FM 1902
- County Road 913
- FM 917
- County Road 904
- Future Sparks Road
- County Road 1125/Industrial Boulevard
- US 67
|
|
|
Q: |
What will be the speed limit? |
|
A: |
The speed limit in Tarrant County will be
50 mph. The speed limit in Johnson County
is yet to be determined. A speed study will be conducted
after the road is built.
|
|