The following are the main objectives for the project, which will run from US 59 to Business US 59:

  • Widen the existing roadway from two lanes to four lanes
  • Evaluate the alternatives of a raised concrete curb median or a depressed grass ditch
  • Build a median to separate eastbound and westbound traffic
  • Evaluate locations for median crossover access
  • Evaluate the need for new bridge structures over the UP railroad and over Business US 59 in order to improve safety and mobility in the area