Horseshoe - request for proposals (RFP)
Skip to main content

Horseshoe - request for proposals (RFP)

Update: The Horseshoe Project has successfully reached commercial close with the execution of the design-build agreement on Feb. 20, 2013.

On Nov. 15, 2012, the Texas Commission conditionally awarded Pegasus Link Constructors to enter into a design, construction and capital maintenance agreement on IH 30 from Sylvan Avenue to IH 35E and IH 35E from north of Eighth Street to the IH 30/IH 35E interchange in Dallas County (the Horseshoe Project or Project).

TxDOT is pleased to present a request for proposals (RFP) to shortlisted teams for the design, construction and capital maintenance on IH 30 from Sylvan Avenue to IH 35E and IH 35E from north of Eighth Street to the IH 30/IH 35E interchange in Dallas County (the Horseshoe Project or Project).

Legal disclaimer – The Reference Information Documents are provided as reference information only project documents. The information contained in these documents reflects information as of any date or time identified therein. TxDOT has not determined whether the project documents are accurate, complete, pertinent, or of any other value to potential developers. TxDOT makes no representation, warranty or guarantee as to, and shall not be responsible for, the accuracy, completeness, or pertinence of the project documents, and, in addition, shall not be responsible for any interpretations thereof or conclusions drawn therefrom. The statements made in the project documents that are not purely historical are forward-looking statements, including TxDOT's hopes, intentions or strategies regarding the future. These statements are based on information currently available to TxDOT and TxDOT assumes no obligation to update any such forward-looking statements.

RFP documents - Horseshoe Project

Below please find the original RFP documents along with the latest addendum. Other documents available for your review include the following:  Previous Addenda (1-5) Addendum 6 Addenda Redline Documents (1-5) Addenda 6 and 7 Redline Documents

Original 07/03/12 Addendum 1 09/04/12 Addendum 2 09/19/12 Addendum 3 09/26/12 Addendum 4 09/28/12
  Addendum 1 Issuance Letter Addendum 2 Issuance Letter Addendum 3 Issuance Letter Addendum 4 Issuance Letter