SH 6 and FM 2 Intersection - Grimes County

The TxDOT Bryan District is developing plans to improve safety at the intersection of SH 6 with FM 2 in Grimes County.  The project would remove the current standard crossover with a grade-separated interchange. A grade-separated interchange is commonly referred to as an underpass or overpass.  This design would no longer allow traffic to directly enter the high-speed intersection without using an on/off ramp to merge into traffic.

Background

Each year, TxDOT reviews our roadway system to determine priority locations for safety improvements. This intersection of SH 6 with FM 2 was evaluated and selected for project development. The Bryan District office is studying design alternatives and investigating potential environmental impacts. The construction plans will be prepared for the most appropriate design. There is no target construction start date at this time.

Get Involved

Downloads

Contact Us

TxDOT Bryan District
Director of Transportation Planning and Development
2591 N. Earl Rudder Freeway
Bryan, TX 77803-5190

(979) 778-2165
Email