Page Options
Up Arrow
FY12 TxDOT Performance Results Summary

Each biennium, the Texas Legislature establishes agency performance targets in the General Appropriations Act. The tables below contain the TxDOT budgetary performance measures for the FY 2012-2013 biennium enacted in HB 1 (82nd Regular Session, 2011) and the results for FY 2012 as reported to the Legislative Budget Board in October 2012. They are organized by the agency's budget structure.

Performance is indicated by the following:

  • Red - 5% below target
  • Yellow - within 5% of target
  • Green - meets or exceeds target

Provide Transportation Planning

Performance Measure Type AY 12 Target AY 12 Year-end Performance Indicator AY 13 Target
Percent of Design Projects Delivered on Time Outcome 91% 68% Red Light 92%
Percent of Design Projects Delivered on Budget Outcome 36% 52% Green Light 37%
Number of Construction Project Preliminary Engineering Plans Completed Output 550 750 Green Light 550
Dollar Volume of Construction Contracts Awarded in Fiscal Year (Millions) Output 2,280 2,972 Green Light 3,110
Number of Projects Awarded Output 640 685 Green Light 600

 

Transportation Improvements

Performance Measure Type AY 12 Target AY 12 Year-end Performance Indicator AY 13 Target
Percent of Construction Projects Completed on Budget Outcome 91% 87.95% Yellow Light 95%
Percent of Two-lane Highways with Improved Shoulders Outcome 58.2% 60.4% Green Light 58.7%
Percent of Railroad Crossings with Signalization Outcome 60% 61.7% Green Light 60.8%
Percent of Construction Projects Completed on Time Outcome 70% 76.55% Green Light 70%
Percent of General Aviation Airport Pavement in Good or Excellent Condition Outcome 75.5% 79% Green Light 76%
Number of Airports Selected for Financial Assistance Output 90 121 Green Light 90

 

Preserve the Transportation System

Performance Measure Type AY 12 Target AY 12 Year-end Performance Indicator AY 13 Target
Percent of Bridges Rated in Good Condition or Higher Outcome 81.8% 81.2% Yellow Light 82.5%
Statewide Maintenance Assessment Program Condition Score Outcome 77% 78.07% Green Light 76%
Statewide Traffic Assessment Program Condition Score Outcome 86.8 87.8 Green Light 86.9
Number of Lane Miles Contracted for Resurfacing Output 15,720 18,693 Green Light 13,719
Number of Highway Lane Miles Resurfaced by State Forces Output 7,518 9,643 Green Light 7,756

 

Optimize Services and Systems

Performance Measure Type AY 12 Target AY 12 Year-end Performance Indicator AY 13 Target
Percent Change in the Number of Public Transportation Trips Outcome 1.5% 28.7% Green Light 1%
Number of Fatalities Per 100 Million Miles Traveled Outcome 1.26 1.28 Yellow Light 1.25

 

Enhance Rail Transportation

Performance Measure Type AY 12 Target AY 12 Year-end Performance Indicator AY 13 Target
Percent Change in the Number of Public Transportation Trips Output 115,360 127,806 Green Light 118,820