Public Meeting - US 59 South/610 West Interchange
| Where: |
Houston Community College
Southwest Campus
5601 West Loop South |
When: |
Wednesday, April 18, 2012
5:30 p.m. - 7:30 p.m. |
| Purpose: |
Gather public input on proposed reconstruction of the US 59 South/610 West Interchange.
|
| Description: |
The interchange improvements are planned to take place in three phases, consisting of the following:
Phase One
- Construct IH 610 SB to US 59 NB Connector (CSJ 0271-17-145)
- Construct IH 610 NB to US 59 SB Connector (CSJ 0271-17-146)
- Construct US 59 NB to IH 610 SB Connector (CSJ 0027-13-206)
- Construct Westheimer Ramp to US 59 SB
- Construct US 59 SB Exit Ramp to Chimney Rock
- Construct Realigned Post Oak Blvd with METRO Accommodations
- Realign IH 610 SB to US 59 SB Connector
- Restripe IH 610 NB to US 59 NB Connector
Phase Two
- Reconstruct US 59 NB to IH 610 NB Connector
- Reconstruct US 59 SB to IH 610 SB Connector
Phase Three
- Reconstruct IH 610 Main Lane Bridge
|
| Downloads: |
|
| Contact: |
Texas Department of Transportation
Courtney Blechle
P.O. Box 1386
Houston, TX 77251-1386
(713) 802-5245
Email
|