Public Hearing - IH 35W (from SH 114 to IH 820)
| Where: |
John M. Tidwell Middle School
3937 Haslet-Roanoke Road
Roanoke, Texas
|
When: |
Thursday, Dec. 15, 2011
6:30 p.m. |
| Purpose: |
A public hearing to present the planned improvements to IH 35W in the cities of Fort Worth and Haslet.
|
| Description: |
Proposed improvements from Eagle Parkway to US 81/US 287 include:
- 10-lane facility with three 12-foot general purpose lanes in each direction plus auxiliary lanes
- 10-foot wide inside and outside shoulders
- Two 12-foot wide managed (toll) lanes in each direction, with 10-foot wide outside and 4-foot wide inside shoulders
- Direct connectors from IH 35W to SH 170
Proposed improvements from US 81/ US 287 to Basswood Boulevard include:
- 12-lane facility with four 12-foot general purpose lanes in each direction plus auxiliary lanes
- 10-foot wide inside and outside shoulders
- Two 12-foot wide managed (toll) lanes in each direction with 10-foot wide outside and 4-foot wide inside shoulders
- Direct connectors to/from US 81/US 287 from IH 35W managed (toll) lanes
Proposed improvements from Basswood Boulevard to IH 820 include:
- 14-lane facility with four 12-foot general purpose lanes in each direction plus auxiliary lanes
- 10-foot wide inside and outside shoulders
- Three 12-foot wide managed (toll) lanes in each direction with 10-foot wide outside and 4-foot wide inside shoulders
Additional proposed corridor improvements from Eagle Parkway to IH 820 include:
- Discontinuous frontage roads with one 12-foot wide inside lane and one 14-foot wide outside shared lane for bicyclists
- 6-foot wide sidewalks for pedestrians
The frontage roads are discontinuous in the southbound direction at the IH 35W/US 81/US 287 interchange.
|
| Downloads: |
|
| Contact: |
John Tillinghast, P.E.
TxDOT Ft. Worth District
2501 SW Loop 820
Fort Worth, Texas 76133
Phone: (817) 370-6594
|