Public Hearing - Loop 375 TransMountain Rd. Project I-10 to east of the Franklin Mountain State Park Entrance
Skip to main content

Public Hearing - Loop 375 TransMountain Rd. Project I-10 to east of the Franklin Mountain State Park Entrance

For more information please refer to the Loop 375 Transmountain Rd. project page.

Where: Canutillo High School
Cafeteria
6675 South Desert Blvd.
El Paso, TX

When: Tuesday, Mar. 22, 2011
6 p.m. - Open House
7:00 p.m. - Public Hearing
Purpose: The purpose of the hearing is to provide information about the proposed improvements to Loop 375 from I-10 to east of the Franklin Mountains State Park entrance, a distance that includes approximately 3.6 miles of mainlanes and approximately 2.10 miles of frontage roads (from Northwestern Drive to Paseo Del Norte Drive).

Description: The proposed improvements will consist of expanding the current two-lane undivided roadway to a four-lane divided roadway with two-lane frontage roads. The improvements also include grade separated intersections at Northwestern Drive, Resler Drive, Plexxar Drive and Paseo del Norte Drive as well as two direct connectors from Loop 375 west to I-10 east and from I-10 west to Loop 375 east. As part of this project shared hike-and-bike trail will be constructed separate from the roadways, near the Loop 375 right-of-way line, between the intersections of Northwestern Drive and Paseo del Norte Drive. Access to the LP 375 main lanes and frontage roads will be by means of entrance and exit ramps at various locations between intersections. The right-of-way (ROW) footprint and geometric design provides for expansion to six main lanes from Northwestern Drive to east of Paseo del Norte Drive.

Downloads:
Contact:

TxDOT El Paso District
Public Information Office
Phone: (915) 790-4200