Statewide Long-Range Transportation Plan 2035 - FAQs
 Why do we need a Statewide Transportation Plan?
The Statewide Long-Range Transportation Plan 2035 will analyze the existing conditions present for each mode, forecast future need and expand on existing performance measures to determine where gaps may exist. The plan:
- Helps address future population and employment growth
- Provides guidance on infrastructure needs and funding
- Integrates various planning efforts into a single, measurable plan
- Meets Federal requirements set forth by the Federal Highway Administration
|
|
 How will the plan be developed?
| The Statewide Long-Range Transportation Plan 2035 will:
|
|
 What is different about this plan?
This plan looks at all modes of transportation together, including future needs for:
- Highways
- Inter-city Buses
- Aviation/Air Access
- Marine/Port Facilities
- Freight/Passenger Rail
- Bicycle/Pedestrian Facilities
- Pipelines
- Intelligent Transportation Systems
- Intermodal Facilities
|
|
 What are the key elements of the plan?
Key elements include:
- 24-Year Planning Time Frame
- Analysis of Existing Transportation System (all modes)
- Analysis of Current Usage, Current Needs and Existing Funding
- Public/Stakeholder Involvement
- Projection of Future Needs by Mode
- Addressing the 8 Planning Factors required by SAFTEA-LU
|
|
 How can I participate?
Public Outreach activities will include:
- Distribution of 3 newsletters with project updates and public meeting information
- Open House-Style Public Meetings to be hosted by each of the 24 TxDOT districts in May and August
- A Public Hearing to be held in Austin in October
|
|
 How do I get more information or submit comments?
|